REPORTS SPONSORED BY THE |
||||||
|
PRINTED REPORTS AVAILABLE |
ADOBE PDF (SELECT LINK) |
PROJECT NUMBER |
PROJECT TITLE |
START DATE | END DATE | REVISED END DATE |
| CP-1 | ACCELERATOR FOR PORTLAND | 3/1/80 | 4/1/81 | |||
| CP-2 | USE OF NUCLEAR GAGES | 3/1/80 | 3/1/81 | |||
| CP-3 | EVALUATION OF STABILITY AND PERMEABILITY OF BASE COURSE DESIGN | 7/1/80 | 6/1/81 | |||
| a | CP-4 | ACCEPTANCE PROCEDURES FOR REINFORCING STEEL | 7/1/80 | 6/1/81 | ||
| CP-5 | OPTIMIZING THE INTERPRETATION OF SEISMIC AND RESISTIVITY DATA | 4/1/81 | 6/1/81 | |||
| a | CP-6 | CONTINUED INVESTIGATION OF ANALYZATION METHODS OF SEISMIC DATA | 10/1/81 | 8/1/82 | ||
| IP-1 | DEVELOPING & MANAGING VEGETATIVE COVERS FOR EROSION CONTROL WITH LITTLE MAINTENANCE IN WEST VIRGINIA HIGHWAY CORRIDORS | 1/30/76 | 1/1/76 | |||
| IP-2 | SYNTHESIS OF STATISTICAL PARAMETERS FOR HIGHWAY CONSTRUCTION | 12/15/77 | 5/1/80 | |||
| IP-3 | DURABILITY OF COATINGS APPLIED TO STEEL STRUCTURES | 2/1/78 | 5/1/80 | |||
| a | IP-4 | RESOURCES FOR EDUCATING TRUCK DRIVERS ABOUT TRUCK ESCAPE RAMPS | 8/16/80 | 7/1/82 | ||
| a | IP-5 | EFFECTIVENESS OF WARNING DEVICES AT RAIL-HIGHWAY GRADE CROSSINGS | 2/22/83 | 7/15/84 | ||
| IHE-1 | DOW 888 COLD JOINT SEALER | 8/1/80 | 4/1/85 | |||
| IHE-2 | STRESS RELIEF INTERLAYER FABRIC (MIRAFI) | 10/1/81 | 1/1/87 | |||
| IHE-3 | STRESS RELIEF INTERLAYER FABRIC (PETROMAT) | 10/1/81 | 6/1/85 | |||
| IHE-4 | PCC JOINT RESTORATION-PRESTRESSED SLABS | 8/1/82 | 4/1/85 | |||
| IHE-5 | PCC JOINT RESTORATION - CAST-IN-PLACE SLABS | 8/1/82 | 4//85 | |||
| IHE-6 | PCC JOINT RESTORATION - INVERTED T | 8/1/82 | 4/1/85 | |||
| IHE-7 | HORIZONTAL SUBDRAIN SYSTEM | 3/1/82 | 12/1/85 | |||
| IHE-8 | FREE DRAINING BASE COURSE | 3/1/82 | 12/1/85 | |||
| IHE-9 | EXPERIMENTAL HOT POUR JOINT SEALERS | 1/1/84 | 1/1/89 | |||
| IHE-10 | HIGH-TYPE RAILROAD HIGHWAY GRADE CROSSING SURFACES | 11/1/84 | 12/1/88 | |||
| RP-1 | EVALUATION OF CRUSHED STONE FOR USE IN BASE COURSE | 2/21/57 | 1/1/66 | |||
| a | RP-2 | CONDUCTING A STATEWIDE SURVEY FOR HIGHWAY AGGREGATES IN WEST VIRGINIA | 1/1/56 | 5/1/62 | ||
| a | RP-3 | EVALUATION OF THE FLY ASH-LIME CEMENT WATER SYSTEM BY MEANS OF FACTORIAL DESIGN | 1/1/56 | 2/1/64 | ||
| RP-4 | ENGINEERING CHARACTERISTICS OF WEST VIRGINIA SOILS | 11/22/61 | 12/31/65 | |||
| a | RP-5 | EFFECT OF TEMPERATURE ON ASPHALTIC CONCRETE AT TIME OF MIXING | 11/22/61 | 8/22/65 | ||
| RP-6 | ECONOMIC IMPACT OF LIMITED ACCESS HIGHWAYS BYPASSING CITIES IN WEST VIRGINIA | 11/22/61 | 7/10/63 | |||
| a | RP-7 | A STUDY OF THE RELATIONSHIP BETWEEN AIR TEMPERATURE AND DEPTH OF FROST PENETRATION AS RELATED TO PAVEMENT PERFORMANCE OF WEST VIRGINIA HIGHWAYS | 4/4/62 | 7/1/66 | ||
| a | RP-7 | PREDICTION OF THE DEPTH OF FROST PENETRATION IN WEST VIRGINIA FOR PAVEMENT DESIGN (TECHNICAL SUPPLEMENTAL) | ||||
| a | RP-8 | DEVELOPMENT OF A PROCEDURE FOR THE DESIGN OF HOT-MIX ASPHALTIC CONCRETE MIXTURES FOR USE ON WEST VIRGINIA HIGHWAYS | 11/22/61 | 6/1/88 | ||
| RP-9 | WEST VIRGINIA HIGHWAY LAWS STUDY | 5/9/63 | 6/30/63 | |||
| RP-10 | LAND USE AND PLANNING CONTROLS | 5/9/62 | 12/1/65 | |||
| RP-11 | URETHANE FOAM AS A BRIDGE DECK INSULATOR (PHASE I) | 8/17/62 | 8/17/63 | |||
| RP-12 | CRITICAL PATH METHOD (C.P.M.) BASED HIGHWAY MANAGEMENT STUDY | 7/8/63 | 1/8/64 | |||
| RP-13 | HIGHWAY MANAGEMENT RESEARCH AGREEMENT | 7/22/63 | 6/30/64 | |||
| RP-14 | WEST VIRGINIA HIGHWAY SEVERANCE DAMAGE STUDY | 1/24/64 | 6/7/68 | |||
| RP-15 | URETHANE FOAM AS A BRIDGE DECK INSULATOR (PHASE II) | 1/1/64 | 5/3/66 | |||
| a | ||||||