1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- February 20, 2002 LETTING Sealed proposals will be received by the West Virginia Department of Transportation, Division of Highways at its office in Building Five, Room A-148, 1900 Kanawha Boulevard East, Charleston, West Virginia 25305-0430 until 10 A.M. February 20, 2002 and said proposals will be publicly opened and read immediately thereafter for the construction of the following project(s): ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 001 9925601 X354-000D/00-004.73 02 0APD 0282 120 C00 CONST NEW/RELOC 4 LANE ROAD W/BRIDGE(S) CORRIDOR D, MARRTOWN R0AD - W JULIANNA STREET SOUTHWEST OF PARKERSBURG COUNTY: WOOD BRIDGE : 4958 CONCRETE SLAB ON PRESTRESSED GIRDER SPAN(S): 2 ; BRIDGE : 4997 CONCRETE SLAB ON PRESTRESSED GIRDER SPAN(S): 3 ; DBE GOAL: 12 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. Electronic data files of this project are available on CD to be used FOR INFORMATION ONLY. These electronic files consist of original MicroStation drawings files (*.dgn) and files that are converted to AutoCAD (*.dwg). We make every reasonable effort to provide these files in a cross-platform and complex multi-protocol environment. The West Virginia Department of Transportation does not possess a staff that is available to provide technical support to outside parties who avail themselves of CAD files that are on this CD. It is important, therefore, that all potential users understand that these file are for information only. The Contractor agrees that WVDOT and its Consultants cannot be held responsible for problems arising from files which have been converted for use in non-native applications (e.g. MicroStation design files to AutoCAD.) Call Kevin Huffman at 304-558-0602, Fax 304-558-4344 or email khuffman@dot.state.wv.us ------------------------------------------------------------------------------------------------------------------------------------ 002 9804426 S346-0076/00-004.56 00 OOBR 0076 012 E00 CONST NEW/RELOC 2 LANE ROAD W/BRIDGE(S) FLEMINGTON WBEAM BRIDGE 06 M EAST CO 13 COUNTY: TAYLOR BRIDGE : 4987 PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 3 ; DBE GOAL: 6 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 003 9715029 X316-000H/00-117.40 08 0APD 0484 139 C00 CONST NEW/RELOC 4 LANE ROAD W/BRIDGE(S) CORRIDOR H, N BRIDGE #4276 - N BRIDGE #4277 0.34 MI N BR 4276 - 0.17 MI N BR 4277 COUNTY: HARDY DBE GOAL: 5 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. Electronic data files of this project are available on CD to be used FOR INFORMATION ONLY. These electronic files consist of original MicroStation drawings files (*.dgn) and files that are converted to AutoCAD (*.dwg). We make every reasonable effort to provide these files in a cross-platform and complex multi-protocol environment. The West Virginia Department of Transportation does not possess a staff that is available to provide technical support to outside parties who avail themselves of CAD files that are on this CD. It is important, therefore, that all potential users understand that these file are for information only. The Contractor agrees that WVDOT and its Consultants cannot be held responsible for problems arising from files which have been converted for use in non-native applications (e.g. MicroStation design files to AutoCAD.) Call Kevin Huffman at 304-558-0602, Fax 304-558-4344 or email khuffman@dot.state.wv.us 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- February 20, 2002 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== REMARKS : MANDATORY PRE-BID 2/5/02, 1:00 P.M. RM 122 ------------------------------------------------------------------------------------------------------------------------------------ 004 0112046 S317-0020/00-034.89 00 0STP 0020 182 E00 REHABILITATION-RESTORATION-RESURFACING WALLACE ROAD CO 20/3 - CO 1 COUNTY: HARRISON ------------------------------------------------------------------------------------------------------------------------------------ 005 0112052 S331-0119/00-017.44 00 00NH 0119 148 E00 REHABILITATION-RESTORATION-RESURFACING EASTON HILL - CANYON ROAD CO 857 - CO 119/31 COUNTY: MONONGALIA ------------------------------------------------------------------------------------------------------------------------------------ 006 0112048 S309-0050/00-015.71 00 00NH 0050 193 E00 RESURFACING WALDO RUN - SALEM ROAD 0.45 MI E CO 50/13 - HARRISON CO LINE COUNTY: DODDRIDGE DBE GOAL: 10 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 007 0115241 S315-0002/00-020.23 00 00NH 0002 382 E00 RESURFACING CHESTER MAIN STREET BEG: 0.79 MI S US 30 END: JCT US 30 COUNTY: HANCOCK DBE GOAL: 3 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 008 0112051 S331-0119/00-012.16 00 0STP 0119 147 E00 RESURFACING UNIVERSITY AVENUE 0.10 MI N CO 857 - 0.76 MI N CO 857 COUNTY: MONONGALIA DBE GOAL: 8 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 009 0112340 S313-0064/00-155.60 00 00IM 0644 132 C00 RESURFACING SAM BLACK TO LOUDERMILK ROAD 0.36 MI W US 60 - 0.14 MI W CO 60/7 COUNTY: GREENBRIER DBE GOAL: 3 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 010 0113843 S331-0068/00-004.31 00 00NH 0068 100 C00 RESURFACING SABRATON TO PEIRPONT OP WV 7 - OP CO 857 COUNTY: MONONGALIA DBE GOAL: 7 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- February 20, 2002 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 011 0113741 S331-0079/00-158.31 00 00IM 0793 180 C00 RESURFACING STAR CITY TO PENNSYLVANIA STATE LINE OP US 19 - PENN STATE LINE COUNTY: MONONGALIA DBE GOAL: 7 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 012 *0128205 E340-0025/08-000.23 00 REPAIR DAMAGE HULBERT HEIGHTS BRIDGE REPAIR 0.05 MI N CR 25/31 (SLS) COUNTY: PUTNAM BRIDGE : 2325.1 CONCRETE ON ROLLED I BEAM SPAN(S): 4 ; ------------------------------------------------------------------------------------------------------------------------------------ 013 9925002 S349-0151/00-000.00 00 CMAQ 0151 002 E00 TRAFFIC SIGNAL BUCKHANNON CBD SIGNAL SYSTEM WV 20 TO CR 151 COUNTY: UPSHUR ------------------------------------------------------------------------------------------------------------------------------------ 014 9913312 S354-0050/00-002.32 00 CMAQ 0050 167 E00 TRAFFIC SIGNAL PARKERSBURG ARTERIAL SIGNAL SYSTEM PARKERSBURG 10 I/S ON US 50, WV 14, WV 68 AND WV 95 COUNTY: WOOD ------------------------------------------------------------------------------------------------------------------------------------ 015 *0008308 U328-0020/00-006.48 00 0STP 0020 173 E00 INTERSECTION IMPROVEMENT GLENWOOD I/S 0.09 MI S CR 19/33 - 0.1 MI N CR 19/33 COUNTY: MERCER ------------------------------------------------------------------------------------------------------------------------------------ 016 0027906 X330-0065/79-000.00 00 CONST NEW/RELOC ROAD W/BRIDGE(S) LENORE SCHOOL ACCESS BRIDGE PIGEON CR @ WV 6 COUNTY: MINGO BRIDGE : 10254 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 2 ; ------------------------------------------------------------------------------------------------------------------------------------ 017 9727407R1 U302-0051/00-004.44 00 0STP 0051 020 E00 CONST TURN LANE(S) INWOOD CENTER TURN LANE INWOOD - WV 51 0.10M W I-81 SB RAMPTO US 11 COUNTY: BERKELEY DBE GOAL: 8 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. CONTRACT: 9727407 DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. ------------------------------------------------------------------------------------------------------------------------------------ Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25304-0430 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Virginia Code. All contractors submitting bids on project(s) must include one of the following forms properly executed with each proposal: Proposal Guaranty Bond, Cashier's Check, or Certified Check for $500.00 or 5% of total bid, whichever is greater. Failure to include one of the above forms could result in a bid being declared irregular. Proposals and bid bonds must be submitted on standard forms which may be obtained at the Charleston office. The right is reserved to reject any or all proposals. *These are projects on which any contractor with a Category "W" Prequalification Rating may be eligible to bid. Final award of all Interstate and Federal-Aid Projects, with the exception of exempt projects, is subject to the approval of the Federal Highway Administration. Minimum wage rates for these projects have been predetermined as required by law and are set forth in the bid proposal. Federal-Aid projects are subject to the WHA of 1961 PL-581 approved August 13, 1962. Plans and proposals on all projects will be furnished at twenty-five dollars ($25.00) per set. Extra plans will be furnished at fifteen dollars ($15.00) per set and extra proposals will be furnished at ten dollars ($10.00) per proposal. Cross sections will be furnished at fifty dollars ($50.00) per set. All will be furnished without refund and transmitted at your risk. The above noted project information will be available in the Contract Unit, Construction Section, Division of Highways, Room A-737, Building 5, 1900 Kanawha Boulevard East, Charleston, WV 25305 and may also be ordered by calling (304)558-2874. The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid bidding proposals will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly opened. The West Virginia Department of Transportation, Division of Highways hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex or national orign in consideration for an award. No proposals for these projects will be issued after 3:00 P.M. on the day prior to the letting. It is necessary to advise your approximate uncompleted workload when ordering plans and proposals. Announcement, opening and reading of bids received will be in the order as designated in the "Notice to Contractors". Sealed proposals may also be deposited in the bid depository box which will be located near the corner of Piedmont Road and California Avenue between the hours of 9 A.M. and 10 A.M., the day of the letting. Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25305-0430 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division Of Highways John J. Welch, Jr., Director Project Control Division 1 1 FEDERAL PROJECT PAGE 1 Call Order : 001 CONTRACT ID : 9925601 Letting Date : 02/20/02 10:00 A.M. PROJECTS : X354-000D/00-004.73 02 0APD 0282 120 C00 COUNTIES : WOOD DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/03 RES. ENG.: GEORGE SHINSKY DESCRIPTION: CORRIDOR D, MARRTOWN R0AD - W JULIANNA STREET ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 202001-000 BUILDING DEMOLITION NUMBER, 102/1 ( 1.00 ) LUMP 0015 202001-000 BUILDING DEMOLITION NUMBER, 102/2 ( 1.00 ) LUMP 0020 202001-000 BUILDING DEMOLITION NUMBER, 102/3 ( 1.00 ) LUMP 0025 202001-000 BUILDING DEMOLITION NUMBER, 102/4 ( 1.00 ) LUMP 0030 202001-000 BUILDING DEMOLITION NUMBER, 103/1 ( 1.00 ) LUMP 0035 202001-000 BUILDING DEMOLITION NUMBER, 104/1 ( 1.00 ) LUMP 0040 202001-000 BUILDING DEMOLITION NUMBER, 105/1 ( 1.00 ) LUMP 0045 202001-000 BUILDING DEMOLITION NUMBER, 105/2 ( 1.00 ) LUMP 0050 202001-000 BUILDING DEMOLITION NUMBER, 105/3 ( 1.00 ) LUMP 0055 202001-000 BUILDING DEMOLITION NUMBER, 105/4 ( 1.00 ) LUMP 0060 202001-000 BUILDING DEMOLITION NUMBER, 106-2/1 ( 1.00 ) LUMP 0065 202001-000 BUILDING DEMOLITION NUMBER, 106-3/1 ( 1.00 ) LUMP 0070 202001-000 BUILDING DEMOLITION NUMBER, 107-1/1 ( 1.00 ) LUMP 0075 202001-000 BUILDING DEMOLITION NUMBER, 107-1/2 ( 1.00 ) LUMP 0080 202001-000 BUILDING DEMOLITION NUMBER, 140/1 ( 1.00 ) LUMP 0085 202001-000 BUILDING DEMOLITION NUMBER, 140/2 ( 1.00 ) LUMP 0090 202001-000 BUILDING DEMOLITION NUMBER, 143/1 ( 1.00 ) LUMP 0095 202001-000 BUILDING DEMOLITION NUMBER, 143/2 ( 1.00 ) LUMP 0100 202001-000 BUILDING DEMOLITION NUMBER, 144/1 ( 1.00 ) LUMP 1 FEDERAL PROJECT PAGE 2 Call Order : 001 CONTRACT ID : 9925601 Letting Date : 02/20/02 10:00 A.M. PROJECTS : X354-000D/00-004.73 02 0APD 0282 120 C00 COUNTIES : WOOD DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/03 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0105 202001-000 BUILDING DEMOLITION NUMBER, 145/1 ( 1.00 ) LUMP 0110 202001-000 BUILDING DEMOLITION NUMBER, 145/2 ( 1.00 ) LUMP 0115 202001-000 BUILDING DEMOLITION NUMBER, 145/3 ( 1.00 ) LUMP 0120 202001-000 BUILDING DEMOLITION NUMBER, 145/4 ( 1.00 ) LUMP 0125 202001-000 BUILDING DEMOLITION NUMBER, 146/1 ( 1.00 ) LUMP 0130 202001-000 BUILDING DEMOLITION NUMBER, 146/2 ( 1.00 ) LUMP 0135 202001-000 BUILDING DEMOLITION NUMBER, 146/3 ( 1.00 ) LUMP 0140 202001-000 BUILDING DEMOLITION NUMBER, 147/1 ( 1.00 ) LUMP 0145 202001-000 BUILDING DEMOLITION NUMBER, 148/1 ( 1.00 ) LUMP 0150 202001-000 BUILDING DEMOLITION NUMBER, 148/2 ( 1.00 ) LUMP 0155 202001-000 BUILDING DEMOLITION NUMBER, 150/1 ( 1.00 ) LUMP 0160 202001-000 BUILDING DEMOLITION NUMBER, 150/2 ( 1.00 ) LUMP 0165 202001-000 BUILDING DEMOLITION NUMBER, 150/3 ( 1.00 ) LUMP 0170 202001-000 BUILDING DEMOLITION NUMBER, 151/1 ( 1.00 ) LUMP 0175 202001-000 BUILDING DEMOLITION NUMBER, 151/2 ( 1.00 ) LUMP 0180 202001-000 BUILDING DEMOLITION NUMBER, 151/3 ( 1.00 ) LUMP 0185 202001-000 BUILDING DEMOLITION NUMBER, 151/4 ( 1.00 ) LUMP 0190 202001-000 BUILDING DEMOLITION NUMBER, 152/1 ( 1.00 ) LUMP 0195 202001-000 BUILDING DEMOLITION NUMBER, 152/2 ( 1.00 ) LUMP 0200 202001-000 BUILDING DEMOLITION NUMBER, 153/1 ( 1.00 ) LUMP 0205 202001-000 BUILDING DEMOLITION NUMBER, 154/1 ( 1.00 ) LUMP 1 FEDERAL PROJECT PAGE 3 Call Order : 001 CONTRACT ID : 9925601 Letting Date : 02/20/02 10:00 A.M. PROJECTS : X354-000D/00-004.73 02 0APD 0282 120 C00 COUNTIES : WOOD DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/03 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0210 202001-000 BUILDING DEMOLITION NUMBER, 154/2 ( 1.00 ) LUMP 0215 202001-000 BUILDING DEMOLITION NUMBER, 155/1 ( 1.00 ) LUMP 0220 202001-000 BUILDING DEMOLITION NUMBER, 161/1 ( 1.00 ) LUMP 0225 202001-000 BUILDING DEMOLITION NUMBER, 161/2 ( 1.00 ) LUMP 0230 202001-000 BUILDING DEMOLITION NUMBER, 175/1 ( 1.00 ) LUMP 0235 202001-000 BUILDING DEMOLITION NUMBER, 109/1 ( 1.00 ) LUMP 0240 202001-000 BUILDING DEMOLITION NUMBER, 109/2 ( 1.00 ) LUMP 0245 202001-000 BUILDING DEMOLITION NUMBER, 109/3 ( 1.00 ) LUMP 0250 202001-000 BUILDING DEMOLITION NUMBER, 110/1 ( 1.00 ) LUMP 0255 202001-000 BUILDING DEMOLITION NUMBER, 111/1 ( 1.00 ) LUMP 0260 202001-000 BUILDING DEMOLITION NUMBER, 112/1 ( 1.00 ) LUMP 0265 202001-000 BUILDING DEMOLITION NUMBER, 112/2 ( 1.00 ) LUMP 0270 202001-000 BUILDING DEMOLITION NUMBER, 113/1 ( 1.00 ) LUMP 0275 202001-000 BUILDING DEMOLITION NUMBER, 113/2 ( 1.00 ) LUMP 0280 202001-000 BUILDING DEMOLITION NUMBER, 114/1 ( 1.00 ) LUMP 0285 202001-000 BUILDING DEMOLITION NUMBER, 114/2 ( 1.00 ) LUMP 0290 202001-000 BUILDING DEMOLITION NUMBER, 115/1 ( 1.00 ) LUMP 0295 202001-000 BUILDING DEMOLITION NUMBER, 115/2 ( 1.00 ) LUMP 0300 202001-000 BUILDING DEMOLITION NUMBER, 116/1 ( 1.00 ) LUMP 0305 202001-000 BUILDING DEMOLITION NUMBER, 116/2 ( 1.00 ) LUMP 0310 202001-000 BUILDING DEMOLITION NUMBER, 117/1 ( 1.00 ) LUMP 1 FEDERAL PROJECT PAGE 4 Call Order : 001 CONTRACT ID : 9925601 Letting Date : 02/20/02 10:00 A.M. PROJECTS : X354-000D/00-004.73 02 0APD 0282 120 C00 COUNTIES : WOOD DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/03 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0315 202001-000 BUILDING DEMOLITION NUMBER, 117/2 ( 1.00 ) LUMP 0320 202001-000 BUILDING DEMOLITION NUMBER, 117/3 ( 1.00 ) LUMP 0325 202001-000 BUILDING DEMOLITION NUMBER, 118-1/1 ( 1.00 ) LUMP 0330 202001-000 BUILDING DEMOLITION NUMBER, 118-1/2 ( 1.00 ) LUMP 0335 202001-000 BUILDING DEMOLITION NUMBER, 120/1 ( 1.00 ) LUMP 0340 202001-000 BUILDING DEMOLITION NUMBER, 120/2 ( 1.00 ) LUMP 0345 202001-000 BUILDING DEMOLITION NUMBER, 127/1 ( 1.00 ) LUMP 0350 202001-000 BUILDING DEMOLITION NUMBER, 129/1 ( 1.00 ) LUMP 0355 202001-000 BUILDING DEMOLITION NUMBER, 129/2 ( 1.00 ) LUMP 0360 202001-000 BUILDING DEMOLITION NUMBER, 118-2/1 ( 1.00 ) LUMP 0365 202001-000 BUILDING DEMOLITION NUMBER, 122/1 ( 1.00 ) LUMP 0370 202001-000 BUILDING DEMOLITION NUMBER, 122/2 ( 1.00 ) LUMP 0375 202001-000 BUILDING DEMOLITION NUMBER, 122/3 ( 1.00 ) LUMP 0380 202001-000 BUILDING DEMOLITION NUMBER, 122/4 ( 1.00 ) LUMP 0385 202001-000 BUILDING DEMOLITION NUMBER, 123/1 ( 1.00 ) LUMP 0390 202001-000 BUILDING DEMOLITION NUMBER, 123/2 ( 1.00 ) LUMP 0395 202001-000 BUILDING DEMOLITION NUMBER, 123/3 ( 1.00 ) LUMP 0400 202001-000 BUILDING DEMOLITION NUMBER, 124/1 ( 1.00 ) LUMP 0405 202001-000 BUILDING DEMOLITION NUMBER, 124/2 ( 1.00 ) LUMP 0410 202001-000 BUILDING DEMOLITION NUMBER, 124/3 ( 1.00 ) LUMP 0415 202001-000 BUILDING DEMOLITION NUMBER, 124/4 ( 1.00 ) LUMP 1 FEDERAL PROJECT PAGE 5 Call Order : 001 CONTRACT ID : 9925601 Letting Date : 02/20/02 10:00 A.M. PROJECTS : X354-000D/00-004.73 02 0APD 0282 120 C00 COUNTIES : WOOD DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/03 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0420 202001-000 BUILDING DEMOLITION NUMBER, 125/1 ( 1.00 ) LUMP 0425 202001-000 BUILDING DEMOLITION NUMBER, 172/1 ( 1.00 ) LUMP 0430 202001-000 BUILDING DEMOLITION NUMBER, 172/2 ( 1.00 ) LUMP 0435 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 107-1/3 LUMP LUMP 0440 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 143/3 LUMP LUMP 0445 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 144/2 LUMP LUMP 0450 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 145/5 LUMP LUMP 0455 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 146/4 LUMP LUMP 0460 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 147/2 LUMP LUMP 0465 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 148/3 LUMP LUMP 0470 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 148/4 LUMP LUMP 0475 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 151/5 LUMP LUMP 0480 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 152/3 LUMP LUMP 0485 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 153/2 LUMP LUMP 0490 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 154/3 LUMP LUMP 0495 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 155/2 LUMP LUMP 0500 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 161/3 LUMP LUMP 0505 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 109/4 LUMP LUMP 0510 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 110/2 LUMP LUMP 0515 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 111/2 LUMP LUMP 0520 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 112/3 LUMP LUMP 1 FEDERAL PROJECT PAGE 6 Call Order : 001 CONTRACT ID : 9925601 Letting Date : 02/20/02 10:00 A.M. PROJECTS : X354-000D/00-004.73 02 0APD 0282 120 C00 COUNTIES : WOOD DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/03 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0525 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 112/4 LUMP LUMP 0530 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 112/5 LUMP LUMP 0535 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 113/3 LUMP LUMP 0540 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 113/4 LUMP LUMP 0545 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 114/3 LUMP LUMP 0550 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 115/3 LUMP LUMP 0555 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 115/4 LUMP LUMP 0560 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 116/3 LUMP LUMP 0565 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 117/4 LUMP LUMP 0570 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 118-1/3 LUMP LUMP 0575 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 120/3 LUMP LUMP 0580 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 129/3 LUMP LUMP 0585 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 118-2/2 LUMP LUMP 0590 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 122/5 LUMP LUMP 0595 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 123/4 LUMP LUMP 0600 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 124/5 LUMP LUMP 0605 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 172/3 LUMP LUMP 0610 204001-000 MOBILIZATION LUMP LUMP 0615 207001-001 UNCLASSIFIED EXCAVATION 806,970.000 CY 0620 207002-000 SUBGRADE 17,207.000 CY 0625 207033-000 FABRIC FOR SUBGRADE STABILIZATION 3,910.000 SY 1 FEDERAL PROJECT PAGE 7 Call Order : 001 CONTRACT ID : 9925601 Letting Date : 02/20/02 10:00 A.M. PROJECTS : X354-000D/00-004.73 02 0APD 0282 120 C00 COUNTIES : WOOD DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/03 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0630 207034-000 FABRIC FOR SEPARATION 102,165.000 SY 0635 218002-000 GROUTED RIPRAP 16.000 CY 0640 311006-001 OPEN GRADED FREE DRAINING BASE COURSE 11,914.000 CY 0645 408002-001 BITUMINOUS MATERIAL 9,739.000 GA 0650 502001-012 12 INCH PORTLAND CEMENT CONCRETE APPROACH SLAB 790.000 SY 0655 601002-001 CLASS B CONCRETE 84.000 CY 0660 605003-001 TYPE A INLET 2.000 EA 0665 605004-001 TYPE B INLET 2.000 EA 0670 605008-001 TYPE F INLET 1.000 EA 0675 605009-001 TYPE G INLET 18.000 EA 0680 605010-001 TYPE H INLET 6.000 EA 0685 606020-001 AGGREGATE FILLED FABRIC UNDERDRAIN, 12"INCH 93.000 LF 0690 606020-001 AGGREGATE FILLED FABRIC UNDERDRAIN, 24"INCH 500.000 LF 0695 606025-002 4 INCH UNDERDRAIN PIPE 103.000 LF 0700 606025-004 6 INCH UNDERDRAIN PIPE 625.000 LF 0705 606029-001 FREE DRAINING BASE TRENCH 22,350.000 LF 0710 606030-001 OUTLET PIPE 10,232.000 LF 0715 607001-001 TYPE 1 GUARDRAIL, CLASS I 6,110.000 LF 0720 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 8.000 EA 0725 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 1,183.000 LF 0730 607030-001 SPECIAL TRAILING END TERMINAL 5.000 EA 1 FEDERAL PROJECT PAGE 8 Call Order : 001 CONTRACT ID : 9925601 Letting Date : 02/20/02 10:00 A.M. PROJECTS : X354-000D/00-004.73 02 0APD 0282 120 C00 COUNTIES : WOOD DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/03 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0735 607030-002 SPECIAL TRAILING END TERMINAL, REMOVED AND RESET 2.000 EA 0740 607066-001 TANGENT END TERMINAL 9.000 EA 0745 608001-004 5 FT RIGHT-OF-WAY FENCE, CHAIN LINK 6,657.000 LF 0750 610003-001 COMBINATION CONCRETE CURB AND GUTTER, TYPE I 190.000 LF 0755 610006-005 MEDIAN, TYPE V 2,406.000 LF 0760 633001-001 CONCRETE GUTTER 1,724.000 SY 0765 633003-001 DUMPED ROCK GUTTER 796.000 CY 0770 636007-001 ERADICATION OF PAVEMENT MARKING 19,200.000 LF 0775 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 28,800.000 LF 0780 636009-001 TEMPORARY PAVEMENT MARKING-TAPE 4 IN SOLID LINE , TYPE VIIB 7,680.000 LF 0785 636010-003 TEMPORARY RAISED PAVEMENT MARKER, TYPE TCZ 4,320.000 EA 0790 636011-001 TRAFFIC CONTROL DEVICE 25,520.000 UN 0795 636012-010 PROJECT TRAFFIC CONTROL DEVICE CLEANING 2.000 EA 0800 636013-001 INDIVIDUAL TRAFFIC CONTROL DEVICE CLEANING 288.000 EA 0805 636014-001 FLAGGER 50.000 HR 0810 636014-002 TRAFFIC DIRECTOR 50.000 HR 0815 636017-001 TEMPORARY CONCRETE BARRIER 5,000.000 LF 0820 636018-001 REMOVE AND RESET TEMPORARY CONCRETE BARRIER 4,400.000 LF 0825 636021-001 ELECTRIC ARROW 640.000 DA 0830 636022-001 CHANGAEBLE MESSAGE SIGN 1,280.000 DA 0835 636025-001 WARNING LIGHTS, TYPE TYPE A 6,780.000 DA 1 FEDERAL PROJECT PAGE 9 Call Order : 001 CONTRACT ID : 9925601 Letting Date : 02/20/02 10:00 A.M. PROJECTS : X354-000D/00-004.73 02 0APD 0282 120 C00 COUNTIES : WOOD DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/03 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0840 636025-001 WARNING LIGHTS, TYPE TYPE B 6,600.000 DA 0845 636025-001 WARNING LIGHTS, TYPE TYPE C 1,500.000 DA 0850 636028-001 SHADOW VEHICLE 50.000 DA 0855 637001-001 WATER FOR DUST PALLIATIVE 1,000.000 MG 0860 638001-001 PROJECT MARKER 2.000 EA 0865 638002-001 RIGHT OF WAY MARKER 80.000 EA 0870 638003-001 SURVEY MARKER 6.000 EA 0875 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0880 640001-001 STANDARD FIELD OFFICE AND STORAGE BUILDING 14.000 MO 0885 640003-001 BUILDING EQUIPMENT LUMP LUMP 0890 642001-001 TEMPORARY BERM 6,636.000 LF 0895 642002-001 SLOPE DRAIN 197.000 LF 0900 642004-001 SEED MIXTURE, TEMPORARY 2,757.000 LB 0905 642004-002 SEED MIXTURE, B 1,765.000 LB 0910 642004-003 SEED MIXTURE, D 1,832.000 LB 0915 642005-001 MULCH, STRAW OR HAY 81.000 TN 0920 642005-002 MULCH, WOOD CELLULOSE FIBER 4.000 TN 0925 642006-001 FERTILIZER 18.000 TN 0930 642009-001 CONTOUR DITCH 33,800.000 LF 0935 642010-001 AGRICULTURAL LIMESTONE 69.000 TN 0940 642011-001 HAY OR STRAW BALE 11,261.000 EA 1 FEDERAL PROJECT PAGE 10 Call Order : 001 CONTRACT ID : 9925601 Letting Date : 02/20/02 10:00 A.M. PROJECTS : X354-000D/00-004.73 02 0APD 0282 120 C00 COUNTIES : WOOD DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/03 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0945 642012-001 SILT FENCE 33,800.000 LF 0950 642031-001 DITCH CHECK 26.000 EA 0955 642033-001 SEDIMENT TRAP 1,280.000 CY 0960 642036-001 SEDIMENT REMOVAL 640.000 CY 0965 652001-001 AGRICULTURAL LIMESTONE 68.000 TN 0970 652002-001 FERTILIZER, 10-20-10 23.000 TN 0975 652002-002 FERTILIZER, UREA FORMALDEHYDE 7.000 TN 0980 652003-001 SEED MIXTURES, B, C-1, OR C-2 1,765.000 LB 0985 652003-002 SEED MIXTURE, D 1,832.000 LB 0990 652004-001 STRAW OR HAY MULCH 81.000 TN 0995 652004-002 WOOD CELLULOSE FIBER MULCH 3.000 TN 1000 655001-001 MATTING 5,379.000 SY 1005 664001-008 IMPACT ATTENUATING DEVICE, TYPE IV 2.000 EA 1010 664001-009 REMOVE AND RESET G.R.E.A.T. ATTENUATOR DEVICE 2.000 EA 1015 681001-001 ASBESTOS ABATEMENT, NUMBER 103/1 LUMP LUMP 1016 681001-001 ASBESTOS ABATEMENT, NUMBER 104/1 LUMP LUMP 1020 681001-001 ASBESTOS ABATEMENT, NUMBER 105/1 LUMP LUMP 1023 681001-001 ASBESTOS ABATEMENT, NUMBER 140/1 LUMP LUMP 1025 681001-001 ASBESTOS ABATEMENT, NUMBER 143/1 LUMP LUMP 1026 681001-001 ASBESTOS ABATEMENT, NUMBER 145/1 LUMP LUMP 1033 681001-001 ASBESTOS ABATEMENT, NUMBER 147/1 LUMP LUMP 1 FEDERAL PROJECT PAGE 11 Call Order : 001 CONTRACT ID : 9925601 Letting Date : 02/20/02 10:00 A.M. PROJECTS : X354-000D/00-004.73 02 0APD 0282 120 C00 COUNTIES : WOOD DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/03 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 1034 681001-001 ASBESTOS ABATEMENT, NUMBER 150/1 LUMP LUMP 1037 681001-001 ASBESTOS ABATEMENT, NUMBER 151/1 LUMP LUMP 1041 681001-001 ASBESTOS ABATEMENT, NUMBER 152/1 LUMP LUMP 1046 681001-001 ASBESTOS ABATEMENT, NUMBER 161/1 LUMP LUMP 1048 681001-001 ASBESTOS ABATEMENT, NUMBER 109/1 LUMP LUMP 1050 681001-001 ASBESTOS ABATEMENT, NUMBER 112/1 LUMP LUMP 1053 681001-001 ASBESTOS ABATEMENT, NUMBER 114/1 LUMP LUMP 1055 681001-001 ASBESTOS ABATEMENT, NUMBER 115/1 LUMP LUMP 1056 681001-001 ASBESTOS ABATEMENT, NUMBER 115/2 LUMP LUMP 1057 681001-001 ASBESTOS ABATEMENT, NUMBER 116/1 LUMP LUMP 1064 681001-001 ASBESTOS ABATEMENT, NUMBER 129/1 LUMP LUMP 1065 681001-001 ASBESTOS ABATEMENT, NUMBER 118-2/1 LUMP LUMP 1073 681001-001 ASBESTOS ABATEMENT, NUMBER 124/1 LUMP LUMP 1077 681001-001 ASBESTOS ABATEMENT, NUMBER 172/1 LUMP LUMP 1080 401001-011 SUPERPAVE HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, 67,112.000 TN AA1 TYPE TYPE I 1085 401001-012 SUPERPAVE HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE TYPE I 61,007.000 TN AA2 1090 401001-011 SUPERPAVE HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, 76.000 TN AB1 TYPE TYPE II 1095 401001-012 SUPERPAVE HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE TYPE II 70.000 TN AB2 1100 401003-011 SUPERPAVE HOT-MIX ASPHALT PATCH AND LEVEL COURSE, 47.000 TN AC1 STONE OR GRAVEL 1105 401003-012 SUPERPAVE HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 43.000 TN AC2 1110 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 2,090.000 TN AD1 1 FEDERAL PROJECT PAGE 12 Call Order : 001 CONTRACT ID : 9925601 Letting Date : 02/20/02 10:00 A.M. PROJECTS : X354-000D/00-004.73 02 0APD 0282 120 C00 COUNTIES : WOOD DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/03 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 1115 401007-002 MARSHALL SCRATCH COURSE, SLAG 1,900.000 TN AD2 1120 402001-011 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 8,252.000 TN AE1 GRAVEL, TYPE I 1125 402001-012 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, 7,498.000 TN AE2 SLAG, TYPE I 1130 604004-010 12 INCH FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED 52.000 LF AF1 STEEL PIPE, A2 1135 604076-010 12 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A7 52.000 LF AF2 1140 604004-012 15 INCH FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED 43.000 LF AG1 STEEL PIPE, A2 1145 604072-112 15 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 2.000 EA AG1 1150 604076-012 15 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A7 44.000 LF AG2 1155 604072-112 15 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 2.000 EA AG2 1160 604037-012 15 INCH REINFORCED CONCRETE PIPE, CLASS CLASS III 44.000 LF AG3 1165 604071-012 15 INCH REINFORCED CONCRETE PIPE SAFETY SLOPE END SECTION 2.000 EA AG3 1170 604004-016 18 INCH FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED 80.000 LF AH1 STEEL PIPE, A2 1175 604072-116 18 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 2.000 EA AH1 1180 604076-016 18 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A7 80.000 LF AH2 1185 604072-116 18 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 2.000 EA AH2 1190 604004-016 18 INCH FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED 194.000 LF AJ1 STEEL PIPE, A2 1195 604009-016 18 INCH CORRUGATED STEEL PIPE END SECTION 2.000 EA AJ1 1200 604076-016 18 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A7 194.000 LF AJ2 1205 604009-016 18 INCH CORRUGATED STEEL PIPE END SECTION 2.000 EA AJ2 1210 604004-016 18 INCH FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED 388.000 LF AK1 STEEL PIPE, A2 1215 604076-016 18 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A7 388.000 LF AK2 1 FEDERAL PROJECT PAGE 13 Call Order : 001 CONTRACT ID : 9925601 Letting Date : 02/20/02 10:00 A.M. PROJECTS : X354-000D/00-004.73 02 0APD 0282 120 C00 COUNTIES : WOOD DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/03 RES. ENG.: GEORGE SHINSKY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 1220 604004-016 18 INCH FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED 47.000 LF AL1 STEEL PIPE, A2 1225 604072-116 18 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 1.000 EA AL1 1230 604076-016 18 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A7 47.000 LF AL2 1235 604072-116 18 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 1.000 EA AL2 1240 604037-016 18 INCH REINFORCED CONCRETE PIPE, CLASS CLASS III 47.000 LF AL3 1245 604071-016 18 INCH REINFORCED CONCRETE PIPE SAFETY SLOPE END SECTION 1.000 EA AL3 1250 604004-016 18 INCH FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED 719.000 LF AM1 STEEL PIPE, A2 1255 604076-016 18 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A7 719.000 LF AM2 1260 604037-016 18 INCH REINFORCED CONCRETE PIPE, CLASS CLASS III 719.000 LF AM3 1265 604004-020 24 INCH FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED 181.000 LF AN1 STEEL PIPE, A2 1270 604076-020 24 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A7 181.000 LF AN2 1275 604004-020 24 INCH FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED 95.000 LF AP1 STEEL PIPE, A2 1280 604009-020 24 INCH CORRUGATED STEEL PIPE END SECTION 1.000 EA AP1 1285 604076-020 24 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A7 95.000 LF AP2 1290 604009-020 24 INCH CORRUGATED STEEL PIPE END SECTION 95.000 EA AP2 1295 604037-020 24 INCH REINFORCED CONCRETE PIPE, CLASS CLASS III 95.000 LF AP3 1300 604038-020 24 INCH REINFORCED CONCRETE PIPE END SECTION 1.000 EA AP3