1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 08/14/00 PAGE : 001 -1 VENDOR RANKING CALL ORDER : 001 CONTRACT ID : 9806102 COUNTIES : PUTNAM LETTING DATE : 08/08/00 10:00 A.M. DISTRICT : 01 CONTRACT DESCRIPTION : LITTLE BUFFALO CREEK BRIDGE PROJECT(S) : S340-0062/00-015.65 00 LOCATION: 0.12 MI E CO 35/3 0 -------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID -------------------------------------------------------------------------------------------------------------------------- 1 55-0599845 WAYNE CONCRETE CO., INC. $ 1,117,089.69 100.0000% 2 31-1316393 AHERN & ASSOCIATES, INC. $ 1,184,000.00 105.9896% 3 55-0487806 ORDERS CONSTRUCTION COMPANY, INC. $ 1,188,197.16 106.3654% 4 31-1527447 MOUNTAINEER GRADING COMPANY $ 1,267,522.33 113.4664% 5 55-0770517 SKILTON CONTRACTING OF WV, LLC $ 2,133,193.60 190.9599% 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 08/14/00 PAGE : 001 -2 TABULATION OF BIDS CALL ORDER : 001 CONTRACT ID : 9806102 COUNTIES : PUTNAM LETTING DATE : 08/08/00 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |(1) 55-0599845 |(2) 31-1316393 |(3) 55-0487806 |WAYNE CONCRETE CO., INC. |AHERN & ASSOCIATES, INC. |ORDERS CONSTRUCTION COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0001 BRIDGE REPLACEMENT | | | 0005 201001-000 1.000 LS | 42000.00000 42000.00| 45401.00000 45401.00| 34000.00000 34000.00 CLEARING AND GRUBBING | | | 0010 203001-000 LUMP| 12500.00000 12500.00| 5000.00000 5000.00| 28000.00000 28000.00 DISMANTLING STRUCTURE | | | 0015 204001-000 LUMP| 35000.00000 35000.00| 35500.00000 35500.00| 30000.00000 30000.00 MOBILIZATION | | | 0020 207001-001 16195.000 CY | 6.00000 97170.00| 8.00000 129560.00| 7.50000 121462.50 UNCLASSIFIED EXCAVATION | | | 0025 207002-000 1436.000 CY | 40.00000 57440.00| 45.00000 64620.00| 45.00000 64620.00 SUBGRADE | | | 0030 207034-000 10210.000 SY | 1.55000 15825.50| 1.25000 12762.50| 1.00000 10210.00 FABRIC FOR SEPARATION | | | 0035 211002-000 5743.000 CY | 10.00000 57430.00| 15.00000 86145.00| 18.00000 103374.00 ROCK BORROW EXCAVATION | | | 0040 212001-000 265.000 CY | 1.00000 265.00| 100.00000 26500.00| 73.50000 19477.50 STRUCTURE EXCAVATION | | | 0045 212005-000 55.000 CY | 75.00000 4125.00| 225.00000 12375.00| 100.00000 5500.00 SELECT MATERIAL FOR BACKFILLING | | | 0050 307001-000 3143.000 CY | 40.00000 125720.00| 45.00000 141435.00| 42.25000 132791.75 AGGREGATE BASE COURSE, CLASS 1 | | | 0055 308001-000 532.000 TN | 30.00000 15960.00| 35.00000 18620.00| 34.00000 18088.00 AGGREGATE BASE COURSE, CLASS 1 | | | 0060 409002-001 2698.000 GA | 1.00000 2698.00| 1.00000 2698.00| 1.10000 2967.80 BITUMINOUS MATERIAL | | | 0065 601002-001 219.000 CY | 600.00000 131400.00| 400.00000 87600.00| 600.00000 131400.00 CLASS B CONCRETE | | | 0070 601003-001 6.000 CY | 2000.00000 12000.00| 1325.00000 7950.00| 2170.00000 13020.00 CLASS K CONCRETE | | | 0075 602002-001 35623.000 LB | 0.85000 30279.55| 0.72000 25648.56| 0.81000 28854.63 EPOXY COATED REINFORCING STEEL BAR | | | 0080 603027-001 42.500 LF | 3000.00000 127500.00| 2800.00000 119000.00| 2420.00000 102850.00 PRECAST REINFORCED CONCRETE THREE-SIDED | | | STRUCTURE | | | 0085 603029-001 273.000 SF | 150.00000 40950.00| 100.00000 27300.00| 75.00000 20475.00 PRECAST REINFORCED CONCRETE HEADWALL | | | 0090 604001-016 146.000 LF | 60.00000 8760.00| 55.00000 8030.00| 75.00000 10950.00 18 INCH METALLIC COATED CORRUGATED | | | STEEL PIPE, A2 | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 08/14/00 PAGE : 001 -3 TABULATION OF BIDS CALL ORDER : 001 CONTRACT ID : 9806102 COUNTIES : PUTNAM LETTING DATE : 08/08/00 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |(1) 55-0599845 |(2) 31-1316393 |(3) 55-0487806 |WAYNE CONCRETE CO., INC. |AHERN & ASSOCIATES, INC. |ORDERS CONSTRUCTION COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0095 604009-016 2.000 EA | 150.00000 300.00| 345.00000 690.00| 130.00000 260.00 18 INCH CORRUGATED STEEL PIPE END | | | SECTION | | | 0100 604072-116 6.000 EA | 335.00000 2010.00| 630.00000 3780.00| 375.00000 2250.00 18 INCH CORRUGATED STEEL PIPE SAFETY | | | SLOPE END SECTION | | | 0105 605009-001 1.000 EA | 1500.00000 1500.00| 1500.00000 1500.00| 1350.00000 1350.00 TYPE G INLET | | | 0110 605040-016 12.000 LF | 100.00000 1200.00| 150.00000 1800.00| 175.00000 2100.00 18 INCH PERFORATED SLOT INLET RISER | | | 0115 607001-001 1850.000 LF | 10.50000 19425.00| 10.50000 19425.00| 11.55000 21367.50 TYPE 1 GUARDRAIL, CLASS 1 | | | 0120 607006-001 4.000 EA | 850.00000 3400.00| 850.00000 3400.00| 935.00000 3740.00 THRIE BEAM GUARDRAIL BRIDGE TRANSITION | | | 0125 616005-006 702.000 LF | 55.00000 38610.00| 70.00000 49140.00| 48.00000 33696.00 HP12X53 STEEL BEARING PILE, PRE-DRILLED | | | AND DRIVEN | | | 0130 633003-001 71.000 CY | 40.00000 2840.00| 70.00000 4970.00| 49.00000 3479.00 DUMPED ROCK GUTTER | | | 0135 636007-001 650.000 LF | 0.75000 487.50| 0.50000 325.00| 0.55000 357.50 ERADICATION OF PAVEMENT MARKING | | | 0140 636009-001 4420.000 LF | 1.00000 4420.00| 1.00000 4420.00| 1.10000 4862.00 TEMPORARY PAVEMENT MARKING-TAPE 4 IN | | | SOLID LINE | | | 0145 636011-001 5840.000 UN | 1.25000 7300.00| 0.80000 4672.00| 0.88000 5139.20 TRAFFIC CONTROL DEVICE | | | 0150 636012-010 3.000 EA | 300.00000 900.00| 100.00000 300.00| 110.00000 330.00 PROJECT TRAFFIC CONTROL DEVICE CLEANING | | | 0155 636013-001 240.000 EA | 5.00000 1200.00| 2.00000 480.00| 2.20000 528.00 INDIVIDUAL TRAFFIC CONTROL DEVICE | | | CLEANING | | | 0160 636014-001 240.000 HR | 35.00000 8400.00| 30.00000 7200.00| 43.00000 10320.00 FLAGGER | | | 0165 636017-001 780.000 LF | 17.00000 13260.00| 15.00000 11700.00| 12.50000 9750.00 TEMPORARY CONCRETE BARRIER | | | 0170 636018-001 1200.000 LF | 7.00000 8400.00| 4.00000 4800.00| 3.90000 4680.00 REMOVE AND RESET TEMPORARY CONCRETE | | | BARRIER | | | 0175 636023-001 1.000 LS | 17500.00000 17500.00| 20000.00000 20000.00| 5000.00000 5000.00 TEMPORARY TRAFFIC SIGNAL | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 08/14/00 PAGE : 001 -4 TABULATION OF BIDS CALL ORDER : 001 CONTRACT ID : 9806102 COUNTIES : PUTNAM LETTING DATE : 08/08/00 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |(1) 55-0599845 |(2) 31-1316393 |(3) 55-0487806 |WAYNE CONCRETE CO., INC. |AHERN & ASSOCIATES, INC. |ORDERS CONSTRUCTION COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0180 636024-001 28.000 LF | 50.00000 1400.00| 45.00000 1260.00| 60.00000 1680.00 TEMPORARY PIPE FOR MAINTAINING TRAFFIC | | | 0185 636025-001 366.000 DA | 0.50000 183.00| 0.39000 142.74| 0.43000 157.38 WARNING LIGHTS, TYPE A | | | 0190 636025-001 732.000 DA | 1.50000 1098.00| 1.35000 988.20| 1.50000 1098.00 WARNING LIGHTS, TYPE B | | | 0195 637001-001 34.000 MG | 0.01000 0.34| 100.00000 3400.00| 53.00000 1802.00 WATER FOR DUST PALLIATIVE | | | 0200 638002-001 15.000 EA | 80.00000 1200.00| 30.00000 450.00| 54.00000 810.00 RIGHT OF WAY MARKER | | | 0205 639001-001 LUMP| 5000.00000 5000.00| 15000.00000 15000.00| 17000.00000 17000.00 CONSTRUCTION LAYOUT STAKE | | | 0210 640002-001 1.000 MO | 1000.00000 1000.00| 1350.00000 1350.00| 6000.00000 6000.00 LARGE FIELD OFFICE AND STORAGE BUILDING | | | 0215 640003-001 LUMP| 1500.00000 1500.00| 2500.00000 2500.00| 750.00000 750.00 BUILDING EQUIPMENT | | | 0220 642004-003 152.000 LB | 18.80000 2857.60| 20.00000 3040.00| 8.00000 1216.00 SEED MIXTURE, D | | | 0225 642005-001 0.500 TN | 500.00000 250.00| 800.00000 400.00| 935.00000 467.50 MULCH, STRAW OR HAY | | | 0230 642005-002 1.700 TN | 1000.00000 1700.00| 550.00000 935.00| 742.00000 1261.40 MULCH, WOOD CELLULOSE FIBER | | | 0235 642006-001 0.900 TN | 600.00000 540.00| 700.00000 630.00| 462.00000 415.80 FERTILIZER | | | 0240 642010-001 4.500 TN | 40.00000 180.00| 60.00000 270.00| 88.00000 396.00 AGRICULTURAL LIMESTONE | | | 0245 642011-001 12.000 EA | 10.00000 120.00| 25.00000 300.00| 7.50000 90.00 HAY OR STRAW BALE | | | 0250 642012-001 2334.000 LF | 1.50000 3501.00| 2.50000 5835.00| 3.00000 7002.00 SILT FENCE | | | 0255 642031-001 20.000 EA | 0.01000 0.20| 100.00000 2000.00| 80.00000 1600.00 DITCH CHECK | | | 0260 642032-001 4.000 EA | 50.00000 200.00| 375.00000 1500.00| 450.00000 1800.00 CHECK DAM | | | 0265 652001-001 9.100 TN | 40.00000 364.00| 60.00000 546.00| 88.00000 800.80 AGRICULTURAL LIMESTONE | | | 0270 652002-001 2.300 TN | 600.00000 1380.00| 800.00000 1840.00| 462.00000 1062.60 FERTILIZER, 10-20-10 | | | 0275 652002-002 0.700 TN | 1500.00000 1050.00| 1200.00000 840.00| 1320.00000 924.00 FERTILIZER, UREA FORMALDEHYDE | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 08/14/00 PAGE : 001 -5 TABULATION OF BIDS CALL ORDER : 001 CONTRACT ID : 9806102 COUNTIES : PUTNAM LETTING DATE : 08/08/00 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |(1) 55-0599845 |(2) 31-1316393 |(3) 55-0487806 |WAYNE CONCRETE CO., INC. |AHERN & ASSOCIATES, INC. |ORDERS CONSTRUCTION COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0280 652003-002 304.000 LB | 20.00000 6080.00| 9.00000 2736.00| 8.00000 2432.00 SEED MIXTURE, D | | | 0285 652004-002 3.400 TN | 1000.00000 3400.00| 700.00000 2380.00| 742.00000 2522.80 WOOD CELLULOSE FIBER MULCH | | | 0290 655001-001 450.000 SY | 1.50000 675.00| 1.50000 675.00| 2.00000 900.00 MATTING | | | 0295 664001-008 4.000 EA | 5500.00000 22000.00| 6000.00000 24000.00| 6050.00000 24200.00 IMPACT ATTENUATING DEVICE, TYPE IV | | | 0300 664001-009 6.000 EA | 1000.00000 6000.00| 1500.00000 9000.00| 1100.00000 6600.00 REMOVE AND RESET G.R.E.A.T. ATTENUATOR | | | DEVICE | | | 0305 401001-001 AA1 3045.000 TN | 30.00000 91350.00| 30.00000 91350.00| 33.00000 100485.00 HOT-MIX ASPHALT BASE COURSE, STONE OR | | | GRAVEL, TYPE 2 | | | 0310 401001-002 AA2 2771.000 TN | | | HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE | | | 2 | | | 0315 402001-001 AB1 333.000 TN | 45.00000 14985.00| 45.00000 14985.00| 49.50000 16483.50 HOT-MIX ASPHALT SKID RESISTANT PAVEMENT,| | | STONE OR GRAVEL, TYPE 1 | | | 0320 402001-002 AB2 304.000 TN | | | HOT-MIX ASPHALT SKID RESISTANT PAVEMENT,| | | SLAG, TYPE 1 | | | 0325 401003-001 AC1 20.000 TN | 45.00000 900.00| 45.00000 900.00| 49.50000 990.00 HOT-MIX ASPHALT PATCH AND LEVEL COURSE, | | | STONE OR GRAVEL 2 | | | 0330 401003-002 AC2 18.000 TN | | | HOT-MIX ASPHALT PATCH AND LEVEL COURSE, | | | SLAG 2 | | | SECTION TOTALS | $ 1,117,089.69| $ 1,184,000.00| $ 1,188,197.16 ------------------------------------------+----------------------------+----------------------------+------------------------------- CONTRACT TOTALS | $ 1,117,089.69| $ 1,184,000.00| $ 1,188,197.16 ==================================================================================================================================== 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 08/14/00 PAGE : 001 -6 TABULATION OF BIDS CALL ORDER : 001 CONTRACT ID : 9806102 COUNTIES : PUTNAM LETTING DATE : 08/08/00 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |(4) 31-1527447 |(5) 55-0770517 | |MOUNTAINEER GRADING COMPANY |SKILTON CONTRACTING OF WV, L| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0001 BRIDGE REPLACEMENT | | | 0005 201001-000 1.000 LS | 10725.00000 10725.00| 10000.00000 10000.00| CLEARING AND GRUBBING | | | 0010 203001-000 LUMP| 9765.00000 9765.00| 62000.00000 62000.00| DISMANTLING STRUCTURE | | | 0015 204001-000 LUMP| 17650.00000 17650.00| 4000.00000 4000.00| MOBILIZATION | | | 0020 207001-001 16195.000 CY | 8.00000 129560.00| 5.00000 80975.00| UNCLASSIFIED EXCAVATION | | | 0025 207002-000 1436.000 CY | 40.00000 57440.00| 37.00000 53132.00| SUBGRADE | | | 0030 207034-000 10210.000 SY | 1.00000 10210.00| 1.00000 10210.00| FABRIC FOR SEPARATION | | | 0035 211002-000 5743.000 CY | 15.00000 86145.00| 14.00000 80402.00| ROCK BORROW EXCAVATION | | | 0040 212001-000 265.000 CY | 5.00000 1325.00| 11.00000 2915.00| STRUCTURE EXCAVATION | | | 0045 212005-000 55.000 CY | 70.00000 3850.00| 44.00000 2420.00| SELECT MATERIAL FOR BACKFILLING | | | 0050 307001-000 3143.000 CY | 40.00000 125720.00| 40.00000 125720.00| AGGREGATE BASE COURSE, CLASS 1 | | | 0055 308001-000 532.000 TN | 22.50000 11970.00| 28.00000 14896.00| AGGREGATE BASE COURSE, CLASS 1 | | | 0060 409002-001 2698.000 GA | 1.06000 2859.88| 1.00000 2698.00| BITUMINOUS MATERIAL | | | 0065 601002-001 219.000 CY | 750.00000 164250.00| 180.00000 39420.00| CLASS B CONCRETE | | | 0070 601003-001 6.000 CY | 1600.00000 9600.00| 1400.00000 8400.00| CLASS K CONCRETE | | | 0075 602002-001 35623.000 LB | 1.00000 35623.00| 0.80000 28498.40| EPOXY COATED REINFORCING STEEL BAR | | | 0080 603027-001 42.500 LF | 4500.00000 191250.00| 27000.00000 1147500.00| PRECAST REINFORCED CONCRETE THREE-SIDED | | | STRUCTURE | | | 0085 603029-001 273.000 SF | 150.00000 40950.00| 130.00000 35490.00| PRECAST REINFORCED CONCRETE HEADWALL | | | 0090 604001-016 146.000 LF | 29.25000 4270.50| 34.00000 4964.00| 18 INCH METALLIC COATED CORRUGATED | | | STEEL PIPE, A2 | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 08/14/00 PAGE : 001 -7 TABULATION OF BIDS CALL ORDER : 001 CONTRACT ID : 9806102 COUNTIES : PUTNAM LETTING DATE : 08/08/00 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |(4) 31-1527447 |(5) 55-0770517 | |MOUNTAINEER GRADING COMPANY |SKILTON CONTRACTING OF WV, L| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0095 604009-016 2.000 EA | 226.00000 452.00| 570.00000 1140.00| 18 INCH CORRUGATED STEEL PIPE END | | | SECTION | | | 0100 604072-116 6.000 EA | 585.00000 3510.00| 900.00000 5400.00| 18 INCH CORRUGATED STEEL PIPE SAFETY | | | SLOPE END SECTION | | | 0105 605009-001 1.000 EA | 1365.00000 1365.00| 1700.00000 1700.00| TYPE G INLET | | | 0110 605040-016 12.000 LF | 125.00000 1500.00| 315.00000 3780.00| 18 INCH PERFORATED SLOT INLET RISER | | | 0115 607001-001 1850.000 LF | 13.00000 24050.00| 12.50000 23125.00| TYPE 1 GUARDRAIL, CLASS 1 | | | 0120 607006-001 4.000 EA | 800.00000 3200.00| 850.00000 3400.00| THRIE BEAM GUARDRAIL BRIDGE TRANSITION | | | 0125 616005-006 702.000 LF | 70.00000 49140.00| 93.00000 65286.00| HP12X53 STEEL BEARING PILE, PRE-DRILLED | | | AND DRIVEN | | | 0130 633003-001 71.000 CY | 5.00000 355.00| 45.00000 3195.00| DUMPED ROCK GUTTER | | | 0135 636007-001 650.000 LF | 1.00000 650.00| 0.50000 325.00| ERADICATION OF PAVEMENT MARKING | | | 0140 636009-001 4420.000 LF | 1.50000 6630.00| 1.00000 4420.00| TEMPORARY PAVEMENT MARKING-TAPE 4 IN | | | SOLID LINE | | | 0145 636011-001 5840.000 UN | 1.25000 7300.00| 0.80000 4672.00| TRAFFIC CONTROL DEVICE | | | 0150 636012-010 3.000 EA | 450.00000 1350.00| 135.00000 405.00| PROJECT TRAFFIC CONTROL DEVICE CLEANING | | | 0155 636013-001 240.000 EA | 10.00000 2400.00| 1.00000 240.00| INDIVIDUAL TRAFFIC CONTROL DEVICE | | | CLEANING | | | 0160 636014-001 240.000 HR | 40.00000 9600.00| 32.00000 7680.00| FLAGGER | | | 0165 636017-001 780.000 LF | 8.00000 6240.00| 34.00000 26520.00| TEMPORARY CONCRETE BARRIER | | | 0170 636018-001 1200.000 LF | 2.50000 3000.00| 2.00000 2400.00| REMOVE AND RESET TEMPORARY CONCRETE | | | BARRIER | | | 0175 636023-001 1.000 LS | 16900.00000 16900.00| 14250.00000 14250.00| TEMPORARY TRAFFIC SIGNAL | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 08/14/00 PAGE : 001 -8 TABULATION OF BIDS CALL ORDER : 001 CONTRACT ID : 9806102 COUNTIES : PUTNAM LETTING DATE : 08/08/00 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |(4) 31-1527447 |(5) 55-0770517 | |MOUNTAINEER GRADING COMPANY |SKILTON CONTRACTING OF WV, L| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0180 636024-001 28.000 LF | 53.00000 1484.00| 38.00000 1064.00| TEMPORARY PIPE FOR MAINTAINING TRAFFIC | | | 0185 636025-001 366.000 DA | 0.75000 274.50| 0.40000 146.40| WARNING LIGHTS, TYPE A | | | 0190 636025-001 732.000 DA | 2.25000 1647.00| 1.35000 988.20| WARNING LIGHTS, TYPE B | | | 0195 637001-001 34.000 MG | 37.00000 1258.00| 35.00000 1190.00| WATER FOR DUST PALLIATIVE | | | 0200 638002-001 15.000 EA | 50.00000 750.00| 108.00000 1620.00| RIGHT OF WAY MARKER | | | 0205 639001-001 LUMP| 26500.00000 26500.00| 37000.00000 37000.00| CONSTRUCTION LAYOUT STAKE | | | 0210 640002-001 1.000 MO | 525.00000 525.00| 12000.00000 12000.00| LARGE FIELD OFFICE AND STORAGE BUILDING | | | 0215 640003-001 LUMP| 5200.00000 5200.00| 4000.00000 4000.00| BUILDING EQUIPMENT | | | 0220 642004-003 152.000 LB | 21.00000 3192.00| 18.80000 2857.60| SEED MIXTURE, D | | | 0225 642005-001 0.500 TN | 845.00000 422.50| 500.00000 250.00| MULCH, STRAW OR HAY | | | 0230 642005-002 1.700 TN | 580.00000 986.00| 1000.00000 1700.00| MULCH, WOOD CELLULOSE FIBER | | | 0235 642006-001 0.900 TN | 740.00000 666.00| 600.00000 540.00| FERTILIZER | | | 0240 642010-001 4.500 TN | 65.00000 292.50| 40.00000 180.00| AGRICULTURAL LIMESTONE | | | 0245 642011-001 12.000 EA | 13.00000 156.00| 15.00000 180.00| HAY OR STRAW BALE | | | 0250 642012-001 2334.000 LF | 2.00000 4668.00| 3.00000 7002.00| SILT FENCE | | | 0255 642031-001 20.000 EA | 38.00000 760.00| 76.00000 1520.00| DITCH CHECK | | | 0260 642032-001 4.000 EA | 38.00000 152.00| 186.00000 744.00| CHECK DAM | | | 0265 652001-001 9.100 TN | 63.00000 573.30| 40.00000 364.00| AGRICULTURAL LIMESTONE | | | 0270 652002-001 2.300 TN | 845.00000 1943.50| 600.00000 1380.00| FERTILIZER, 10-20-10 | | | 0275 652002-002 0.700 TN | 1270.00000 889.00| 1500.00000 1050.00| FERTILIZER, UREA FORMALDEHYDE | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 08/14/00 PAGE : 001 -9 TABULATION OF BIDS CALL ORDER : 001 CONTRACT ID : 9806102 COUNTIES : PUTNAM LETTING DATE : 08/08/00 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |(4) 31-1527447 |(5) 55-0770517 | |MOUNTAINEER GRADING COMPANY |SKILTON CONTRACTING OF WV, L| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0280 652003-002 304.000 LB | 9.50000 2888.00| 20.00000 6080.00| SEED MIXTURE, D | | | 0285 652004-002 3.400 TN | 740.00000 2516.00| 1000.00000 3400.00| WOOD CELLULOSE FIBER MULCH | | | 0290 655001-001 450.000 SY | 1.60000 720.00| 1.50000 675.00| MATTING | | | 0295 664001-008 4.000 EA | 6860.00000 27440.00| 5500.00000 22000.00| IMPACT ATTENUATING DEVICE, TYPE IV | | | 0300 664001-009 6.000 EA | 1275.00000 7650.00| 1000.00000 6000.00| REMOVE AND RESET G.R.E.A.T. ATTENUATOR | | | DEVICE | | | 0305 401001-001 AA1 3045.000 TN | 35.89000 109285.05| 39.00000 118755.00| HOT-MIX ASPHALT BASE COURSE, STONE OR | | | GRAVEL, TYPE 2 | | | 0310 401001-002 AA2 2771.000 TN | | | HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE | | | 2 | | | 0315 402001-001 AB1 333.000 TN | 38.00000 12654.00| 53.00000 17649.00| HOT-MIX ASPHALT SKID RESISTANT PAVEMENT,| | | STONE OR GRAVEL, TYPE 1 | | | 0320 402001-002 AB2 304.000 TN | | | HOT-MIX ASPHALT SKID RESISTANT PAVEMENT,| | | SLAG, TYPE 1 | | | 0325 401003-001 AC1 20.000 TN | 61.23000 1224.60| 64.00000 1280.00| HOT-MIX ASPHALT PATCH AND LEVEL COURSE, | | | STONE OR GRAVEL 2 | | | 0330 401003-002 AC2 18.000 TN | | | HOT-MIX ASPHALT PATCH AND LEVEL COURSE, | | | SLAG 2 | | | SECTION TOTALS | $ 1,267,522.33| $ 2,133,193.60| ------------------------------------------+----------------------------+----------------------------+------------------------------- CONTRACT TOTALS | $ 1,267,522.33| $ 2,133,193.60| ==================================================================================================================================== 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 08/14/00 PAGE : 002 -1 VENDOR RANKING CALL ORDER : 002 CONTRACT ID : 9809912 COUNTIES : TYLER LETTING DATE : 08/08/00 10:00 A.M. DISTRICT : 06 CONTRACT DESCRIPTION : JACKSON BRIDGE PROJECT(S) : S348-0018/00-020.53 00 LOCATION: 1.56 MILES NORTH OF JUNCTION WITH 18/6 0 -------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID -------------------------------------------------------------------------------------------------------------------------- 1 31-1316393 AHERN & ASSOCIATES, INC. $ 1,455,300.00 100.0000% 2 55-0417282 TURMAN CONSTRUCTION CO. $ 1,528,932.59 105.0596% 3 55-0609442 MEC CONSTRUCTION, INC. $ 1,565,821.63 107.5944% 4 55-0487806 ORDERS CONSTRUCTION COMPANY, INC. $ 1,569,781.20 107.8665% 5 62-1345425 BILCO CONSTRUCTION COMPANY, INC. $ 1,577,730.00 108.4126% 6 34-1421920 OHIO-WEST VIRGINIA EXCAVATING CO., INC. $ 1,579,409.15 108.5280% 7 55-0434699 SAVAGE CONSTRUCTION COMPANY, INC. $ 1,759,333.73 120.8914% 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 08/14/00 PAGE : 002 -2 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9809912 COUNTIES : TYLER LETTING DATE : 08/08/00 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |(1) 31-1316393 |(2) 55-0417282 |(3) 55-0609442 |AHERN & ASSOCIATES, INC. |TURMAN CONSTRUCTION CO. |MEC CONSTRUCTION, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0001 BRIDGE APPROACHES | | | 0005 201-01 1.000 LS | 43034.46000 43034.46| 50000.00000 50000.00| 92500.00000 92500.00 CLEARING AND GRUBBING | | | 0010 204-01 LUMP| 43650.00000 43650.00| 22000.00000 22000.00| 26160.00000 26160.00 MOBILIZATION | | | 0015 207-01 5088.000 CY | 8.50000 43248.00| 7.00000 35616.00| 10.25000 52152.00 UNCLASSIFIED EXCAVATION | | | 0020 207-02 659.000 CY | 30.00000 19770.00| 45.00000 29655.00| 40.00000 26360.00 SUBGRADE | | | 0025 207-34 2308.000 SY | 0.95000 2192.60| 1.50000 3462.00| 0.85000 1961.80 FABRIC FOR SEPARATION | | | 0030 211-02 2397.000 CY | 20.00000 47940.00| 13.25000 31760.25| 34.00000 81498.00 ROCK BORROW EXCAVATION | | | 0035 240-01(15) 123.000 LF | 10.00000 1230.00| 15.00000 1845.00| 13.00000 1599.00 CLEANING CULVERTS | | | 0040 307-01 701.000 CY | 34.50000 24184.50| 34.45000 24149.45| 41.00000 28741.00 CLASS 1 AGGREGATE BASE COURSE | | | 0045 308-01 527.000 TN | 30.00000 15810.00| 21.78000 11478.06| 26.00000 13702.00 CLASS 1 AGGREGATE BASE COURSE | | | 0050 409-02 2503.000 GA | 1.33000 3328.99| 1.33000 3328.99| 1.49000 3729.47 BITUMINOUS MATERIAL | | | 0055 502-01(12I) 178.000 SY | 155.00000 27590.00| 130.00000 23140.00| 130.00000 23140.00 PORTLAND CEMENT CONCRETE APPROACH SLAB | | | 0060 606-20(24) 785.000 LF | 12.50000 9812.50| 15.00000 11775.00| 9.00000 7065.00 AGGREGATE FILLED FABRIC UNDERDRAIN | | | 0065 606-25(6) 158.000 LF | 40.00000 6320.00| 10.00000 1580.00| 8.00000 1264.00 UNDERDRAIN PIPE | | | 0070 607-01(I) 1000.000 LF | 10.25000 10250.00| 11.10000 11100.00| 9.00000 9000.00 TYPE 1 GUARDRAIL | | | 0075 607-06 4.000 EA | 750.00000 3000.00| 700.00000 2800.00| 840.00000 3360.00 THRIE BEAM GUARDRAIL BRIDGE TRANSITION | | | 0080 607-65 2.000 EA | 1150.00000 2300.00| 1200.00000 2400.00| 1600.00000 3200.00 FLARED END TERMINAL | | | 0085 636-07 350.000 LF | 0.75000 262.50| 0.75000 262.50| 0.84000 294.00 ERADICATION OF PAVEMENT MARKINGS | | | 0090 636-08 745.000 LF | 1.00000 745.00| 1.00000 745.00| 1.12000 834.40 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN | | | SOLID LINE | | | 0095 636-09 745.000 LF | 1.25000 931.25| 1.25000 931.25| 1.40000 1043.00 TEMPORARY PAVEMENT MARKINGS-TAPE 4 IN | | | SOLID LINE | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 08/14/00 PAGE : 002 -3 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9809912 COUNTIES : TYLER LETTING DATE : 08/08/00 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |(1) 31-1316393 |(2) 55-0417282 |(3) 55-0609442 |AHERN & ASSOCIATES, INC. |TURMAN CONSTRUCTION CO. |MEC CONSTRUCTION, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0100 636-10(TCZ) 300.000 EA | 4.00000 1200.00| 4.00000 1200.00| 4.48000 1344.00 TEMPORARY RAISED PAVEMENT MARKERS, TYPE | | | TCZ | | | 0105 636-11 6072.000 UN | 1.10000 6679.20| 1.10000 6679.20| 1.23000 7468.56 TRAFFIC CONTROL DEVICES | | | 0110 636-12 12.000 EA | 300.00000 3600.00| 300.00000 3600.00| 50.00000 600.00 CLEANING OF PROJECT TRAFFIC CONTROL | | | DEVICES | | | 0115 636-13 100.000 EA | 5.00000 500.00| 5.00000 500.00| 4.00000 400.00 CLEANING OF INDIVIDUAL TRAFFIC CONTROL | | | DEVICES | | | 0120 636-14 500.000 HR | 35.00000 17500.00| 35.00000 17500.00| 46.00000 23000.00 FLAGGER | | | 0125 636-25(A) 500.000 DA | 0.50000 250.00| 0.50000 250.00| 0.56000 280.00 WARNING LIGHTS | | | 0130 636-25(B) 1000.000 DA | 1.50000 1500.00| 1.50000 1500.00| 1.68000 1680.00 WARNING LIGHTS | | | 0135 638-02 17.000 EA | 74.00000 1258.00| 60.00000 1020.00| 60.00000 1020.00 RIGHT OF WAY MARKERS | | | 0140 639-01 LUMP| 15000.00000 15000.00| 5500.00000 5500.00| 6100.00000 6100.00 CONSTRUCTION LAYOUT STAKES | | | 0145 640-02 LUMP| 15000.00000 15000.00| 10000.00000 10000.00| 8100.00000 8100.00 SMALL FIELD OFFICE AND STORAGE BUILDING | | | 0150 640-03 LUMP| 1800.00000 1800.00| 2000.00000 2000.00| 1300.00000 1300.00 BUILDING EQUIPMENT | | | 0155 642-13 LUMP| 3200.00000 3200.00| 4000.00000 4000.00| 2300.00000 2300.00 TEMPORARY POLLUTION CONTROL | | | 0160 652-01 1.650 TN | 65.00000 107.25| 60.00000 99.00| 112.00000 184.80 AGRICULTURAL LIMESTONE | | | 0165 652-02-1 0.440 TN | 1500.00000 660.00| 1500.00000 660.00| 2900.00000 1276.00 FERTILIZER, 10-20-10 | | | 0170 652-03-1 105.000 LB | 10.00000 1050.00| 10.00000 1050.00| 9.00000 945.00 SEED MIXTURES B, C-1 OR C-2 | | | 0175 652-04-1 2.200 TN | 660.00000 1452.00| 600.00000 1320.00| 1100.00000 2420.00 STRAW OR HAY MULCH | | | 0180 401-1(1)SG AA1 1090.000 TN | 38.00000 41420.00| 37.90000 41311.00| 41.00000 44690.00 HOT-MIX ASPHALT BASE COURSE, STONE OR | | | GRAVEL | | | 0185 401-1(1)S AA2 982.000 TN | | | HOT-MIX ASPHALT BASE COURSE, SLAG | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 08/14/00 PAGE : 002 -4 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9809912 COUNTIES : TYLER LETTING DATE : 08/08/00 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |(1) 31-1316393 |(2) 55-0417282 |(3) 55-0609442 |AHERN & ASSOCIATES, INC. |TURMAN CONSTRUCTION CO. |MEC CONSTRUCTION, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0190 401-1(2)SG AB1 211.000 TN | 40.00000 8440.00| 39.94000 8427.34| 44.00000 9284.00 HOT-MIX ASPHALT BASE COURSE, STONE OR | | | GRAVEL | | | 0195 401-1(2)S AB2 189.000 TN | | | HOT-MIX ASPHALT BASE COURSE, SLAG | | | 0200 402-01(1)SG AC1 237.000 TN | 45.00000 10665.00| 44.40000 10522.80| 49.50000 11731.50 HMA SKID PVT, (W-1) ST OR GR | | | 0205 402-01(1)S AC2 213.000 TN | | | HMA SKID PVT, (W-1) SLAG | | | 0210 636-02SG AD1 100.000 TN | 35.00000 3500.00| 22.00000 2200.00| 24.00000 2400.00 AGGREGATE FOR MAINTAINING TRAFFIC, | | | STONE OR GRAVEL | | | 0215 636-02S AD2 90.000 TN | | | AGGREGATE FOR MAINTAINING TRAFFIC, SLAG | | | SECTION TOTALS | $ 440,381.25| $ 387,367.84| $ 504,127.53 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0002 BRIDGE | | | 0220 203-01 LUMP| 75000.00000 75000.00| 30000.00000 30000.00| 39500.00000 39500.00 DISMANTLING STRUCTURES | | | 0225 211-02 1055.000 CY | 5.00000 5275.00| 12.00000 12660.00| 36.00000 37980.00 ROCK BORROW EXCAVATION | | | 0230 212-01 663.000 CY | 28.00000 18564.00| 20.00000 13260.00| 19.00000 12597.00 STRUCTURE EXCAVATION | | | 0235 212-02 820.000 CY | 32.00000 26240.00| 85.00000 69700.00| 60.00000 49200.00 WET EXCAVATION | | | 0240 212-05 71.000 CY | 100.00000 7100.00| 70.00000 4970.00| 75.00000 5325.00 SELECT MATERIAL FOR BACKFILLING | | | 0245 601-02 496.000 CY | 300.00000 148800.00| 370.00000 183520.00| 405.00000 200880.00 CLASS B CONCRETE | | | 0250 601-03 291.000 CY | 550.00000 160050.00| 570.00000 165870.00| 515.00000 149865.00 CLASS K CONCRETE | | | 0255 602-02 195273.000 LB | 0.75000 146454.75| 0.75000 146454.75| 0.70000 136691.10 EPOXY COATED REINFORCING STEELBARS | | | 0260 603-01(60) 908.000 LF | 225.00000 204300.00| 185.00000 167980.00| 203.00000 184324.00 PRESTRESSED CONC BEAMS 60 IN DEEP | | | 0265 616-05HP12X53 373.000 LF | 55.00000 20515.00| 75.00000 27975.00| 49.00000 18277.00 STEEL BEARING PILES, PRE-DRILLED AND | | | DRIVEN | | | 0270 636-05 1.000 LS | 110000.00000 110000.00| 200000.00000 200000.00| 133750.00000 133750.00 TEMPORARY STRUCTURES FOR MAINTAINING | | | TRAFFIC | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 08/14/00 PAGE : 002 -5 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9809912 COUNTIES : TYLER LETTING DATE : 08/08/00 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |(1) 31-1316393 |(2) 55-0417282 |(3) 55-0609442 |AHERN & ASSOCIATES, INC. |TURMAN CONSTRUCTION CO. |MEC CONSTRUCTION, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0275 639-01 LUMP| 5000.00000 5000.00| 7500.00000 7500.00| 11000.00000 11000.00 CONSTRUCTION LAYOUT STAKES | | | 0280 679-02 45.000 CY | 1000.00000 45000.00| 1500.00000 67500.00| 1260.00000 56700.00 LATEX MODIFED PORTLAND CEMENT CONCRETE | | | OVERLAY BRIDGE DECK | | | 0285 679-06 LUMP| 500.00000 500.00| 2000.00000 2000.00| 500.00000 500.00 TEST SLAB | | | SECTION TOTALS | $ 972,798.75| $ 1,099,389.75| $ 1,036,589.10 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0003 RELOCATE SANITARY SEWER LINE | | | 0290 639-01 LUMP| 5000.00000 5000.00| 1500.00000 1500.00| 780.00000 780.00 CONSTRUCTION LAYOUT STAKES | | | 0295 670-04(4)II50 140.000 LF | 75.00000 10500.00| 40.00000 5600.00| 38.00000 5320.00 DUCTILE IRON PIPE | | | 0300 670-07(4)200 745.000 LF | 28.00000 20860.00| 35.00000 26075.00| 21.00000 15645.00 PLASTIC PIPE, CLASS 200 | | | 0305 670-09(4) 6.000 EA | 960.00000 5760.00| 1500.00000 9000.00| 560.00000 3360.00 GATE VALVE AND VALVE BOX | | | SECTION TOTALS | $ 42,120.00| $ 42,175.00| $ 25,105.00 ------------------------------------------+----------------------------+----------------------------+------------------------------- CONTRACT TOTALS | $ 1,455,300.00| $ 1,528,932.59| $ 1,565,821.63 ==================================================================================================================================== 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 08/14/00 PAGE : 002 -6 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9809912 COUNTIES : TYLER LETTING DATE : 08/08/00 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |(4) 55-0487806 |(5) 62-1345425 |(6) 34-1421920 |ORDERS CONSTRUCTION COMPANY,|BILCO CONSTRUCTION COMPANY, |OHIO-WEST VIRGINIA EXCAVATIN LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0001 BRIDGE APPROACHES | | | 0005 201-01 1.000 LS | 55000.00000 55000.00| 99000.00000 99000.00| 10000.00000 10000.00 CLEARING AND GRUBBING | | | 0010 204-01 LUMP| 41000.00000 41000.00| 31000.00000 31000.00| 43000.00000 43000.00 MOBILIZATION | | | 0015 207-01 5088.000 CY | 9.70000 49353.60| 15.00000 76320.00| 8.00000 40704.00 UNCLASSIFIED EXCAVATION | | | 0020 207-02 659.000 CY | 25.00000 16475.00| 37.00000 24383.00| 38.00000 25042.00 SUBGRADE | | | 0025 207-34 2308.000 SY | 1.00000 2308.00| 0.75000 1731.00| 1.00000 2308.00 FABRIC FOR SEPARATION | | | 0030 211-02 2397.000 CY | 16.75000 40149.75| 23.00000 55131.00| 35.00000 83895.00 ROCK BORROW EXCAVATION | | | 0035 240-01(15) 123.000 LF | 22.00000 2706.00| 14.00000 1722.00| 10.00000 1230.00 CLEANING CULVERTS | | | 0040 307-01 701.000 CY | 38.00000 26638.00| 37.00000 25937.00| 37.00000 25937.00 CLASS 1 AGGREGATE BASE COURSE | | | 0045 308-01 527.000 TN | 40.00000 21080.00| 24.00000 12648.00| 19.00000 10013.00 CLASS 1 AGGREGATE BASE COURSE | | | 0050 409-02 2503.000 GA | 1.45000 3629.35| 1.50000 3754.50| 1.35000 3379.05 BITUMINOUS MATERIAL | | | 0055 502-01(12I) 178.000 SY | 157.00000 27946.00| 130.00000 23140.00| 145.00000 25810.00 PORTLAND CEMENT CONCRETE APPROACH SLAB | | | 0060 606-20(24) 785.000 LF | 17.70000 13894.50| 10.00000 7850.00| 7.00000 5495.00 AGGREGATE FILLED FABRIC UNDERDRAIN | | | 0065 606-25(6) 158.000 LF | 36.70000 5798.60| 8.00000 1264.00| 2.00000 316.00 UNDERDRAIN PIPE | | | 0070 607-01(I) 1000.000 LF | 11.25000 11250.00| 13.00000 13000.00| 10.25000 10250.00 TYPE 1 GUARDRAIL | | | 0075 607-06 4.000 EA | 825.00000 3300.00| 800.00000 3200.00| 750.00000 3000.00 THRIE BEAM GUARDRAIL BRIDGE TRANSITION | | | 0080 607-65 2.000 EA | 1265.00000 2530.00| 1500.00000 3000.00| 1150.00000 2300.00 FLARED END TERMINAL | | | 0085 636-07 350.000 LF | 1.40000 490.00| 1.00000 350.00| 1.25000 437.50 ERADICATION OF PAVEMENT MARKINGS | | | 0090 636-08 745.000 LF | 0.75000 558.75| 1.25000 931.25| 0.67000 499.15 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN | | | SOLID LINE | | | 0095 636-09 745.000 LF | 1.40000 1043.00| 1.50000 1117.50| 1.25000 931.25 TEMPORARY PAVEMENT MARKINGS-TAPE 4 IN | | | SOLID LINE | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 08/14/00 PAGE : 002 -7 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9809912 COUNTIES : TYLER LETTING DATE : 08/08/00 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |(4) 55-0487806 |(5) 62-1345425 |(6) 34-1421920 |ORDERS CONSTRUCTION COMPANY,|BILCO CONSTRUCTION COMPANY, |OHIO-WEST VIRGINIA EXCAVATIN LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0100 636-10(TCZ) 300.000 EA | 4.40000 1320.00| 4.50000 1350.00| 3.00000 900.00 TEMPORARY RAISED PAVEMENT MARKERS, TYPE | | | TCZ | | | 0105 636-11 6072.000 UN | 1.15000 6982.80| 0.75000 4554.00| 1.20000 7286.40 TRAFFIC CONTROL DEVICES | | | 0110 636-12 12.000 EA | 290.00000 3480.00| 0.25000 3.00| 250.00000 3000.00 CLEANING OF PROJECT TRAFFIC CONTROL | | | DEVICES | | | 0115 636-13 100.000 EA | 4.00000 400.00| 0.01000 1.00| 5.00000 500.00 CLEANING OF INDIVIDUAL TRAFFIC CONTROL | | | DEVICES | | | 0120 636-14 500.000 HR | 43.00000 21500.00| 42.00000 21000.00| 32.00000 16000.00 FLAGGER | | | 0125 636-25(A) 500.000 DA | 0.35000 175.00| 1.00000 500.00| 0.30000 150.00 WARNING LIGHTS | | | 0130 636-25(B) 1000.000 DA | 1.45000 1450.00| 3.00000 3000.00| 1.30000 1300.00 WARNING LIGHTS | | | 0135 638-02 17.000 EA | 53.00000 901.00| 100.00000 1700.00| 100.00000 1700.00 RIGHT OF WAY MARKERS | | | 0140 639-01 LUMP| 8600.00000 8600.00| 25000.75000 25000.75| 2500.00000 2500.00 CONSTRUCTION LAYOUT STAKES | | | 0145 640-02 LUMP| 11500.00000 11500.00| 7500.00000 7500.00| 10000.00000 10000.00 SMALL FIELD OFFICE AND STORAGE BUILDING | | | 0150 640-03 LUMP| 700.00000 700.00| 2000.00000 2000.00| 1000.00000 1000.00 BUILDING EQUIPMENT | | | 0155 642-13 LUMP| 9250.00000 9250.00| 600.00000 600.00| 1000.00000 1000.00 TEMPORARY POLLUTION CONTROL | | | 0160 652-01 1.650 TN | 165.00000 272.25| 80.00000 132.00| 60.00000 99.00 AGRICULTURAL LIMESTONE | | | 0165 652-02-1 0.440 TN | 865.00000 380.60| 2000.00000 880.00| 1500.00000 660.00 FERTILIZER, 10-20-10 | | | 0170 652-03-1 105.000 LB | 7.15000 750.75| 12.00000 1260.00| 10.00000 1050.00 SEED MIXTURES B, C-1 OR C-2 | | | 0175 652-04-1 2.200 TN | 715.00000 1573.00| 700.00000 1540.00| 600.00000 1320.00 STRAW OR HAY MULCH | | | 0180 401-1(1)SG AA1 1090.000 TN | 41.75000 45507.50| 42.00000 45780.00| 38.00000 41420.00 HOT-MIX ASPHALT BASE COURSE, STONE OR | | | GRAVEL | | | 0185 401-1(1)S AA2 982.000 TN | | | HOT-MIX ASPHALT BASE COURSE, SLAG | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 08/14/00 PAGE : 002 -8 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9809912 COUNTIES : TYLER LETTING DATE : 08/08/00 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |(4) 55-0487806 |(5) 62-1345425 |(6) 34-1421920 |ORDERS CONSTRUCTION COMPANY,|BILCO CONSTRUCTION COMPANY, |OHIO-WEST VIRGINIA EXCAVATIN LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0190 401-1(2)SG AB1 211.000 TN | 44.00000 9284.00| 44.00000 9284.00| 42.00000 8862.00 HOT-MIX ASPHALT BASE COURSE, STONE OR | | | GRAVEL | | | 0195 401-1(2)S AB2 189.000 TN | | | HOT-MIX ASPHALT BASE COURSE, SLAG | | | 0200 402-01(1)SG AC1 237.000 TN | 49.00000 11613.00| 49.00000 11613.00| 46.00000 10902.00 HMA SKID PVT, (W-1) ST OR GR | | | 0205 402-01(1)S AC2 213.000 TN | | | HMA SKID PVT, (W-1) SLAG | | | 0210 636-02SG AD1 100.000 TN | 23.00000 2300.00| 21.00000 2100.00| 20.00000 2000.00 AGGREGATE FOR MAINTAINING TRAFFIC, | | | STONE OR GRAVEL | | | 0215 636-02S AD2 90.000 TN | | | AGGREGATE FOR MAINTAINING TRAFFIC, SLAG | | | SECTION TOTALS | $ 463,090.45| $ 525,277.00| $ 406,196.35 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0002 BRIDGE | | | 0220 203-01 LUMP| 32000.00000 32000.00| 45000.00000 45000.00| 32000.00000 32000.00 DISMANTLING STRUCTURES | | | 0225 211-02 1055.000 CY | 31.25000 32968.75| 20.00000 21100.00| 35.00000 36925.00 ROCK BORROW EXCAVATION | | | 0230 212-01 663.000 CY | 45.50000 30166.50| 30.00000 19890.00| 35.00000 23205.00 STRUCTURE EXCAVATION | | | 0235 212-02 820.000 CY | 13.00000 10660.00| 45.00000 36900.00| 110.00000 90200.00 WET EXCAVATION | | | 0240 212-05 71.000 CY | 100.00000 7100.00| 95.00000 6745.00| 80.00000 5680.00 SELECT MATERIAL FOR BACKFILLING | | | 0245 601-02 496.000 CY | 300.00000 148800.00| 430.00000 213280.00| 350.00000 173600.00 CLASS B CONCRETE | | | 0250 601-03 291.000 CY | 650.00000 189150.00| 525.00000 152775.00| 700.00000 203700.00 CLASS K CONCRETE | | | 0255 602-02 195273.000 LB | 0.50000 97636.50| 0.70000 136691.10| 0.60000 117163.80 EPOXY COATED REINFORCING STEELBARS | | | 0260 603-01(60) 908.000 LF | 206.00000 187048.00| 200.00000 181600.00| 200.00000 181600.00 PRESTRESSED CONC BEAMS 60 IN DEEP | | | 0265 616-05HP12X53 373.000 LF | 37.00000 13801.00| 52.00000 19396.00| 63.00000 23499.00 STEEL BEARING PILES, PRE-DRILLED AND | | | DRIVEN | | | 0270 636-05 1.000 LS | 265000.00000 265000.00| 150000.00000 150000.00| 245000.00000 245000.00 TEMPORARY STRUCTURES FOR MAINTAINING | | | TRAFFIC | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 08/14/00 PAGE : 002 -9 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9809912 COUNTIES : TYLER LETTING DATE : 08/08/00 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |(4) 55-0487806 |(5) 62-1345425 |(6) 34-1421920 |ORDERS CONSTRUCTION COMPANY,|BILCO CONSTRUCTION COMPANY, |OHIO-WEST VIRGINIA EXCAVATIN LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0275 639-01 LUMP| 8600.00000 8600.00| 5000.90000 5000.90| 500.00000 500.00 CONSTRUCTION LAYOUT STAKES | | | 0280 679-02 45.000 CY | 980.00000 44100.00| 850.00000 38250.00| 400.00000 18000.00 LATEX MODIFED PORTLAND CEMENT CONCRETE | | | OVERLAY BRIDGE DECK | | | 0285 679-06 LUMP| 7500.00000 7500.00| 1750.00000 1750.00| 1000.00000 1000.00 TEST SLAB | | | SECTION TOTALS | $ 1,074,530.75| $ 1,028,378.00| $ 1,152,072.80 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0003 RELOCATE SANITARY SEWER LINE | | | 0290 639-01 LUMP| 600.00000 600.00| 3500.00000 3500.00| 350.00000 350.00 CONSTRUCTION LAYOUT STAKES | | | 0295 670-04(4)II50 140.000 LF | 88.00000 12320.00| 35.00000 4900.00| 42.00000 5880.00 DUCTILE IRON PIPE | | | 0300 670-07(4)200 745.000 LF | 22.00000 16390.00| 15.00000 11175.00| 18.00000 13410.00 PLASTIC PIPE, CLASS 200 | | | 0305 670-09(4) 6.000 EA | 475.00000 2850.00| 750.00000 4500.00| 250.00000 1500.00 GATE VALVE AND VALVE BOX | | | SECTION TOTALS | $ 32,160.00| $ 24,075.00| $ 21,140.00 ------------------------------------------+----------------------------+----------------------------+------------------------------- CONTRACT TOTALS | $ 1,569,781.20| $ 1,577,730.00| $ 1,579,409.15 ==================================================================================================================================== 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 08/14/00 PAGE : 002 -10 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9809912 COUNTIES : TYLER LETTING DATE : 08/08/00 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |(7) 55-0434699 | | |SAVAGE CONSTRUCTION COMPANY,| | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0001 BRIDGE APPROACHES | | | 0005 201-01 1.000 LS | 18000.00000 18000.00| | CLEARING AND GRUBBING | | | 0010 204-01 LUMP| 39690.00000 39690.00| | MOBILIZATION | | | 0015 207-01 5088.000 CY | 7.00000 35616.00| | UNCLASSIFIED EXCAVATION | | | 0020 207-02 659.000 CY | 45.00000 29655.00| | SUBGRADE | | | 0025 207-34 2308.000 SY | 1.24000 2861.92| | FABRIC FOR SEPARATION | | | 0030 211-02 2397.000 CY | 43.90000 105228.30| | ROCK BORROW EXCAVATION | | | 0035 240-01(15) 123.000 LF | 8.90000 1094.70| | CLEANING CULVERTS | | | 0040 307-01 701.000 CY | 37.00000 25937.00| | CLASS 1 AGGREGATE BASE COURSE | | | 0045 308-01 527.000 TN | 23.00000 12121.00| | CLASS 1 AGGREGATE BASE COURSE | | | 0050 409-02 2503.000 GA | 1.36000 3404.08| | BITUMINOUS MATERIAL | | | 0055 502-01(12I) 178.000 SY | 117.00000 20826.00| | PORTLAND CEMENT CONCRETE APPROACH SLAB | | | 0060 606-20(24) 785.000 LF | 4.30000 3375.50| | AGGREGATE FILLED FABRIC UNDERDRAIN | | | 0065 606-25(6) 158.000 LF | 12.90000 2038.20| | UNDERDRAIN PIPE | | | 0070 607-01(I) 1000.000 LF | 11.50000 11500.00| | TYPE 1 GUARDRAIL | | | 0075 607-06 4.000 EA | 715.00000 2860.00| | THRIE BEAM GUARDRAIL BRIDGE TRANSITION | | | 0080 607-65 2.000 EA | 1225.00000 2450.00| | FLARED END TERMINAL | | | 0085 636-07 350.000 LF | 1.28000 448.00| | ERADICATION OF PAVEMENT MARKINGS | | | 0090 636-08 745.000 LF | 0.69000 514.05| | TEMPORARY PAVEMENT MARKINGS-PAINT 4IN | | | SOLID LINE | | | 0095 636-09 745.000 LF | 1.28000 953.60| | TEMPORARY PAVEMENT MARKINGS-TAPE 4 IN | | | SOLID LINE | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 08/14/00 PAGE : 002 -11 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9809912 COUNTIES : TYLER LETTING DATE : 08/08/00 10:00 A.M. DISTRICT : 06 SET-ASIDE : =======================================================================================================================