1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 07/31/00 PAGE : 001 -1 VENDOR RANKING CALL ORDER : 001 CONTRACT ID : 9913724 COUNTIES : WETZEL LETTING DATE : 07/11/00 10:00 A.M. DISTRICT : 06 CONTRACT DESCRIPTION : FOLSOM-SMITHFIELD ROAD PROJECT(S) : S352-0020/00-003.41 00 0STP 0020 154 E00 LOCATION: BEGIN: JCT CR 20/11 END: JCT CR 84 0 -------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID -------------------------------------------------------------------------------------------------------------------------- 1 55-0601828 KLUG BROS., INC. $ 502,144.45 100.0000% 2 55-0481221 MOUNTAINEER CONTRACTORS, INC. & SUBSIDIARY $ 503,760.94 100.3219% 3 55-0592491 DODD GENERAL CONTRACTORS CORPORATION $ 568,943.01 113.3026% 4 55-0328627 J. F. ALLEN COMPANY $ 600,983.75 119.6834% 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 07/31/00 PAGE : 001 -2 TABULATION OF BIDS CALL ORDER : 001 CONTRACT ID : 9913724 COUNTIES : WETZEL LETTING DATE : 07/11/00 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |(1) 55-0601828 |(2) 55-0481221 |(3) 55-0592491 |KLUG BROS., INC. |MOUNTAINEER CONTRACTORS, INC|DODD GENERAL CONTRACTORS COR LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0001 RESURFACING | | | 0005 211-08 180.000 TN | 33.18000 5972.40| 30.00000 5400.00| 28.80000 5184.00 ROCK BORROW EXCAVATION | | | 0010 218-03 63.000 CY | 130.00000 8190.00| 125.00000 7875.00| 208.92000 13161.96 GABIONS | | | 0015 229-01 3.210 LM | 7238.00000 23233.98| 5000.00000 16050.00| 5471.96000 17564.99 SHOULDERS AND DITCHES | | | 0020 240-01(15) 178.000 LF | 11.38000 2025.64| 11.00000 1958.00| 11.00000 1958.00 CLEANING CULVERTS | | | 0025 240-01(18) 128.000 LF | 12.33000 1578.24| 12.00000 1536.00| 12.00000 1536.00 CLEANING CULVERTS | | | 0030 240-06 180.000 LF | 7.28000 1310.40| 10.00000 1800.00| 9.00000 1620.00 CLEANING INLET AND OUTLET DITCHES | | | 0035 408-02 3052.000 GA | 1.07000 3265.64| 0.50000 1526.00| 0.90000 2746.80 BITUMINOUS MATERIAL | | | 0040 604-01(15)A2 41.000 LF | 37.44000 1535.04| 75.00000 3075.00| 70.72000 2899.52 METALLIC COATED CORRUGATED STEEL PIPE | | | 0045 604-01(18)A2 397.000 LF | 60.32000 23947.04| 80.00000 31760.00| 115.92000 46020.24 METALLIC COATED CORRUGATED STEEL PIPE | | | 0050 604-01(24)A2 192.000 LF | 62.40000 11980.80| 85.00000 16320.00| 164.82000 31645.44 METALLIC COATED CORRUGATED STEEL PIPE | | | 0055 604-53(18) 16.000 LF | 52.00000 832.00| 75.00000 1200.00| 115.00000 1840.00 RELAID CONDUIT | | | 0060 604-53(36) 8.000 LF | 135.20000 1081.60| 85.00000 680.00| 375.00000 3000.00 RELAID CONDUIT | | | 0065 604-70(5X4) 30.000 LF | 657.22000 19716.60| 600.00000 18000.00| 920.00000 27600.00 PRECAST CONCRETE BOX CULVERT | | | 0070 605-09 23.000 EA | 1652.80000 38014.40| 1500.00000 34500.00| 2455.00000 56465.00 TYPE G INLET | | | 0075 607-01(I) 6525.000 LF | 10.40000 67860.00| 10.00000 65250.00| 8.98000 58594.50 TYPE 1 GUARDRAIL | | | 0080 607-01(II) 2275.000 LF | 8.32000 18928.00| 8.00000 18200.00| 6.65000 15128.75 TYPE 1 GUARDRAIL | | | 0085 607-10-1(A) 512.500 LF | 1.04000 533.00| 1.00000 512.50| 1.00000 512.50 GUARDRAIL REMOVAL | | | 0090 607-25(A) 14.000 EA | 314.00000 4396.00| 300.00000 4200.00| 350.00000 4900.00 CUT SLOPE TERMINAL, TYPE A | | | 0095 607-25(B) 1.000 EA | 517.30000 517.30| 500.00000 500.00| 450.00000 450.00 CUT SLOPE TERMINAL, TYPE B | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 07/31/00 PAGE : 001 -3 TABULATION OF BIDS CALL ORDER : 001 CONTRACT ID : 9913724 COUNTIES : WETZEL LETTING DATE : 07/11/00 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |(1) 55-0601828 |(2) 55-0481221 |(3) 55-0592491 |KLUG BROS., INC. |MOUNTAINEER CONTRACTORS, INC|DODD GENERAL CONTRACTORS COR LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0100 607-36 4.000 EA | 104.00000 416.00| 100.00000 400.00| 40.00000 160.00 END SHOE FOR CUT TERMINALS AND BRIDGE | | | CONNECTIONS | | | 0105 607-37 9.000 EA | 26.00000 234.00| 25.00000 225.00| 25.00000 225.00 BUFFER END SECTION | | | 0110 607-65 12.000 EA | 837.00000 10044.00| 800.00000 9600.00| 1050.00000 12600.00 FLARED END TERMINAL | | | 0115 607-66 1.000 EA | 1820.00000 1820.00| 1750.00000 1750.00| 1500.00000 1500.00 TANGENT END TERMINAL | | | 0120 636-08 33452.000 LF | 0.23000 7693.96| 0.15000 5017.80| 0.18000 6021.36 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN | | | SOLID LINE | | | 0125 636-11 3185.000 UN | 0.77000 2452.45| 1.00000 3185.00| 0.85000 2707.25 TRAFFIC CONTROL DEVICES | | | 0130 636-14 775.000 HR | 30.44000 23591.00| 35.00000 27125.00| 35.15000 27241.25 FLAGGER | | | 0135 670-23 1.000 EA | 312.00000 312.00| 500.00000 500.00| 800.00000 800.00 ADJUSTING VALVE BOX | | | 0140 308-01SG AA1 1097.000 TN | 21.21000 23267.37| 15.00000 16455.00| 19.86000 21786.42 CLASS 1 AGGREGATE, STONE OR GRAVEL | | | 0145 308-01S AA2 1075.000 TN | | | CLASS 1 AGGREGATE, SLAG | | | 0150 407-1(II)SG BB1 3815.000 TN | 34.17000 130358.55| 37.52000 143138.80| 35.45000 135241.75 HOT-MIX ASPHALT BASE COURSE, STONE OR | | | GRAVEL | | | 0155 407-1(II)S BB2 3472.000 TN | | | HOT-MIX ASPHALT BASE COURSE, SLAG | | | 0160 407-2(III)SG CC1 1692.000 TN | 39.62000 67037.04| 39.02000 66021.84| 40.09000 67832.28 HOT-MIX ASPHALT WEARING COURSE, STONE | | | OR GRAVEL | | | 0165 407-2(III)S CC2 1540.000 TN | | | HOT-MIX ASPHALT WEARING COURSE, SLAG | | | SECTION TOTALS | $ 502,144.45| $ 503,760.94| $ 568,943.01 ------------------------------------------+----------------------------+----------------------------+------------------------------- CONTRACT TOTALS | $ 502,144.45| $ 503,760.94| $ 568,943.01 ==================================================================================================================================== 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 07/31/00 PAGE : 001 -4 TABULATION OF BIDS CALL ORDER : 001 CONTRACT ID : 9913724 COUNTIES : WETZEL LETTING DATE : 07/11/00 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |(4) 55-0328627 | | |J. F. ALLEN COMPANY | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0001 RESURFACING | | | 0005 211-08 180.000 TN | 88.20000 15876.00| | ROCK BORROW EXCAVATION | | | 0010 218-03 63.000 CY | 225.75000 14222.25| | GABIONS | | | 0015 229-01 3.210 LM | 4648.80000 14922.65| | SHOULDERS AND DITCHES | | | 0020 240-01(15) 178.000 LF | 16.80000 2990.40| | CLEANING CULVERTS | | | 0025 240-01(18) 128.000 LF | 18.90000 2419.20| | CLEANING CULVERTS | | | 0030 240-06 180.000 LF | 20.00000 3600.00| | CLEANING INLET AND OUTLET DITCHES | | | 0035 408-02 3052.000 GA | 0.01000 30.52| | BITUMINOUS MATERIAL | | | 0040 604-01(15)A2 41.000 LF | 139.65000 5725.65| | METALLIC COATED CORRUGATED STEEL PIPE | | | 0045 604-01(18)A2 397.000 LF | 91.35000 36265.95| | METALLIC COATED CORRUGATED STEEL PIPE | | | 0050 604-01(24)A2 192.000 LF | 120.75000 23184.00| | METALLIC COATED CORRUGATED STEEL PIPE | | | 0055 604-53(18) 16.000 LF | 220.50000 3528.00| | RELAID CONDUIT | | | 0060 604-53(36) 8.000 LF | 99.25000 794.00| | RELAID CONDUIT | | | 0065 604-70(5X4) 30.000 LF | 1117.20000 33516.00| | PRECAST CONCRETE BOX CULVERT | | | 0070 605-09 23.000 EA | 2121.00000 48783.00| | TYPE G INLET | | | 0075 607-01(I) 6525.000 LF | 10.50000 68512.50| | TYPE 1 GUARDRAIL | | | 0080 607-01(II) 2275.000 LF | 8.40000 19110.00| | TYPE 1 GUARDRAIL | | | 0085 607-10-1(A) 512.500 LF | 1.05000 538.13| | GUARDRAIL REMOVAL | | | 0090 607-25(A) 14.000 EA | 315.00000 4410.00| | CUT SLOPE TERMINAL, TYPE A | | | 0095 607-25(B) 1.000 EA | 525.00000 525.00| | CUT SLOPE TERMINAL, TYPE B | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 07/31/00 PAGE : 001 -5 TABULATION OF BIDS CALL ORDER : 001 CONTRACT ID : 9913724 COUNTIES : WETZEL LETTING DATE : 07/11/00 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |(4) 55-0328627 | | |J. F. ALLEN COMPANY | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0100 607-36 4.000 EA | 105.00000 420.00| | END SHOE FOR CUT TERMINALS AND BRIDGE | | | CONNECTIONS | | | 0105 607-37 9.000 EA | 26.25000 236.25| | BUFFER END SECTION | | | 0110 607-65 12.000 EA | 840.00000 10080.00| | FLARED END TERMINAL | | | 0115 607-66 1.000 EA | 1837.50000 1837.50| | TANGENT END TERMINAL | | | 0120 636-08 33452.000 LF | 0.20000 6690.40| | TEMPORARY PAVEMENT MARKINGS-PAINT 4IN | | | SOLID LINE | | | 0125 636-11 3185.000 UN | 1.20000 3822.00| | TRAFFIC CONTROL DEVICES | | | 0130 636-14 775.000 HR | 40.00000 31000.00| | FLAGGER | | | 0135 670-23 1.000 EA | 500.00000 500.00| | ADJUSTING VALVE BOX | | | 0140 308-01SG AA1 1097.000 TN | 21.65000 23750.05| | CLASS 1 AGGREGATE, STONE OR GRAVEL | | | 0145 308-01S AA2 1075.000 TN | | | CLASS 1 AGGREGATE, SLAG | | | 0150 407-1(II)SG BB1 3815.000 TN | 38.50000 146877.50| | HOT-MIX ASPHALT BASE COURSE, STONE OR | | | GRAVEL | | | 0155 407-1(II)S BB2 3472.000 TN | | | HOT-MIX ASPHALT BASE COURSE, SLAG | | | 0160 407-2(III)SG CC1 1692.000 TN | 45.40000 76816.80| | HOT-MIX ASPHALT WEARING COURSE, STONE | | | OR GRAVEL | | | 0165 407-2(III)S CC2 1540.000 TN | | | HOT-MIX ASPHALT WEARING COURSE, SLAG | | | SECTION TOTALS | $ 600,983.75| | ------------------------------------------+----------------------------+----------------------------+------------------------------- CONTRACT TOTALS | $ 600,983.75| | ==================================================================================================================================== 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 07/31/00 PAGE : 002 -1 VENDOR RANKING CALL ORDER : 002 CONTRACT ID : 9907406 COUNTIES : LOGAN LETTING DATE : 07/11/00 10:00 A.M. DISTRICT : 02 CONTRACT DESCRIPTION : HUFF JUNCTION - BUFFALO CREEK BRIDGE PROJECT(S) : S323-0010/00-007.36 02 00HP 1159 004 C00 LOCATION: WV 80 I/S - 0.7 MI N WV 80 0 -------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID -------------------------------------------------------------------------------------------------------------------------- 1 55-0683174 HEETER CONSTRUCTION, INC. $ 16,774,282.00 100.0000% 2 61-0874665 ELMO GREER & SONS, LLC $ 16,794,881.70 100.1228% 3 55-0535003 KANAWHA STONE COMPANY, INC. $ 17,750,615.95 105.8204% 4 55-0345840 VECELLIO & GROGAN, INC. $ 23,227,586.05 138.4714% 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 07/31/00 PAGE : 002 -2 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9907406 COUNTIES : LOGAN LETTING DATE : 07/11/00 10:00 A.M. DISTRICT : 02 SET-ASIDE : ==================================================================================================================================== |(1) 55-0683174 |(2) 61-0874665 |(3) 55-0535003 |HEETER CONSTRUCTION, INC. |ELMO GREER & SONS, LLC |KANAWHA STONE COMPANY, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0001 ROADWAY | | | 0005 201-01 1.000 LS | 300000.00000 300000.00| 455000.00000 455000.00| 585000.00000 585000.00 CLEARING AND GRUBBING | | | 0010 202-01 LUMP| 6000.00000 6000.00| 9800.00000 9800.00| 1.00000 1.00 BUILDING DEMOLITION ,202-01(01) | | | 0015 202-01 LUMP| 500.00000 500.00| 1800.00000 1800.00| 1.00000 1.00 BUILDING DEMOLITION ,202-01(04) | | | 0020 202-03 LUMP| 500.00000 500.00| 2400.00000 2400.00| 500.00000 500.00 SEPTIC TANK ABANDONMENT ,202-03(01) | | | 0025 204-01 LUMP| 300000.00000 300000.00| 581000.00000 581000.00| 250000.00000 250000.00 MOBILIZATION | | | 0030 207-01 2324800.000 CY | 5.10000 11856480.00| 5.03000 11693744.00| 5.50000 12786400.00 UNCLASSIFIED EXCAVATION | | | 0035 207-02 5726.000 CY | 40.00000 229040.00| 34.50000 197547.00| 36.00000 206136.00 SUBGRADE | | | 0040 207-34 41250.000 SY | 1.30000 53625.00| 1.12000 46200.00| 1.15000 47437.50 FABRIC FOR SEPARATION | | | 0042 307-01 1543.000 CY | 50.00000 77150.00| 44.00000 67892.00| 46.00000 70978.00 CLASS 1 AGGREGATE BASE COURSE | | | 0045 311-06 3368.000 CY | 75.00000 252600.00| 65.00000 218920.00| 68.50000 230708.00 OPEN GRADED FREE DRAINING BASE COURSE | | | 0050 409-02 2777.000 GA | 1.20000 3332.40| 1.00000 2777.00| 1.00000 2777.00 BITUMINOUS MATERIAL | | | 0055 601-02 8.000 CY | 1800.00000 14400.00| 1200.00000 9600.00| 1850.00000 14800.00 CLASS B CONCRETE | | | 0060 604-02(24)A2 157.000 LF | 45.00000 7065.00| 35.00000 5495.00| 260.00000 40820.00 FULL BITUMINOUS COATED CORRUGATED STEEL | | | PIPE | | | 0065 604-02(36)A2 311.000 LF | 55.00000 17105.00| 50.00000 15550.00| 270.00000 83970.00 FULL BITUMINOUS COATED CORRUGATED STEEL | | | PIPE | | | 0070 604-37(18)III 467.000 LF | 40.00000 18680.00| 36.00000 16812.00| 60.00000 28020.00 REINFORCED CONCRETE PIPE | | | 0075 604-37(24)III 926.000 LF | 55.00000 50930.00| 49.00000 45374.00| 70.00000 64820.00 REINFORCED CONCRETE PIPE | | | 0080 604-37(30)III 520.000 LF | 65.00000 33800.00| 66.00000 34320.00| 80.00000 41600.00 REINFORCED CONCRETE PIPE | | | 0085 604-37(36)III 886.000 LF | 80.00000 70880.00| 88.00000 77968.00| 115.00000 101890.00 REINFORCED CONCRETE PIPE | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 07/31/00 PAGE : 002 -3 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9907406 COUNTIES : LOGAN LETTING DATE : 07/11/00 10:00 A.M. DISTRICT : 02 SET-ASIDE : ==================================================================================================================================== |(1) 55-0683174 |(2) 61-0874665 |(3) 55-0535003 |HEETER CONSTRUCTION, INC. |ELMO GREER & SONS, LLC |KANAWHA STONE COMPANY, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0090 604-54(24)V 74.000 LF | 800.00000 59200.00| 714.00000 52836.00| 400.00000 29600.00 JACKED CONDUIT, REINFORCED CONCRETE | | | PIPE CLASS V | | | 0095 604-54(36)V 150.000 LF | 950.00000 142500.00| 857.00000 128550.00| 475.00000 71250.00 JACKED CONDUIT, REINFORCED CONCRETE | | | PIPE CLASS V | | | 0100 605-01 3.000 EA | 2500.00000 7500.00| 3300.00000 9900.00| 2300.00000 6900.00 TYPE A MANHOLE | | | 0105 605-01-1 4.000 EA | 2500.00000 10000.00| 3900.00000 15600.00| 2450.00000 9800.00 TYPE A MANHOLE, MODIFIED | | | 0110 605-04 18.000 EA | 2500.00000 45000.00| 2300.00000 41400.00| 1950.00000 35100.00 TYPE B INLET | | | 0115 605-09 32.000 EA | 2500.00000 80000.00| 2400.00000 76800.00| 1950.00000 62400.00 TYPE G INLET | | | 0120 606-22 173.000 CY | 55.00000 9515.00| 46.00000 7958.00| 48.00000 8304.00 CRUSHED STONE, GRAVEL,OR SILICA SAND | | | FOR UNDERDRAINS | | | 0125 606-25(6) 1992.000 LF | 10.00000 19920.00| 10.00000 19920.00| 10.50000 20916.00 UNDERDRAIN PIPE | | | 0130 606-29 7964.000 LF | 14.00000 111496.00| 12.00000 95568.00| 12.50000 99550.00 FREE DRAINING BASE (FDB) TRENCH | | | 0135 606-30 605.000 LF | 12.00000 7260.00| 10.00000 6050.00| 10.50000 6352.50 OUTLET PIPE | | | 0140 607-01(I) 3283.000 LF | 11.50000 37754.50| 9.70000 31845.10| 10.20000 33486.60 TYPE 1 GUARDRAIL | | | 0145 607-06 2.000 EA | 900.00000 1800.00| 1825.00000 3650.00| 1920.00000 3840.00 THRIE BEAM GUARDRAIL BRIDGE TRANSITION | | | 0150 607-09-1 104.000 LF | 5.00000 520.00| 9.15000 951.60| 9.65000 1003.60 TYPE 1 GUARDRAIL REMOVED AND RESET | | | 0155 607-25(B) 2.000 EA | 525.00000 1050.00| 857.50000 1715.00| 900.00000 1800.00 CUT SLOPE TERMINAL, TYPE B | | | 0160 607-30 2.000 EA | 450.00000 900.00| 453.00000 906.00| 475.00000 950.00 SPECIAL TRAILING END TERMINAL | | | 0165 607-65 4.000 EA | 1400.00000 5600.00| 1370.00000 5480.00| 1440.00000 5760.00 FLARED END TERMINAL | | | 0170 608-02(3F11I) 7796.000 LF | 10.75000 83807.00| 4.35000 33912.60| 5.35000 41708.60 RIGHT-OF-WAY FENCE, FARM FIELD TYPE | | | 0175 609-01 45.000 SY | 33.00000 1485.00| 125.00000 5625.00| 30.00000 1350.00 CONCRETE SIDEWALK | | | 0180 610-01(IV) 90.000 LF | 40.00000 3600.00| 12.00000 1080.00| 35.00000 3150.00 PLAIN CONCRETE CURBING | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 07/31/00 PAGE : 002 -4 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9907406 COUNTIES : LOGAN LETTING DATE : 07/11/00 10:00 A.M. DISTRICT : 02 SET-ASIDE : ==================================================================================================================================== |(1) 55-0683174 |(2) 61-0874665 |(3) 55-0535003 |HEETER CONSTRUCTION, INC. |ELMO GREER & SONS, LLC |KANAWHA STONE COMPANY, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0185 610-03(I)MOD 866.000 LF | 31.50000 27279.00| 22.00000 19052.00| 28.00000 24248.00 COMBINATION CONCRETE CURB AND GUTTER | | | (MODIFIED) | | | 0190 610-03(IV)MOD 262.000 LF | 41.00000 10742.00| 20.00000 5240.00| 36.50000 9563.00 COMBINATION CONCRETE CURB AND GUTTER, | | | MODIFIED | | | 0195 610-06(V) 3459.000 LF | 75.00000 259425.00| 72.00000 249048.00| 6.80000 23521.20 MEDIAN, TYPE V | | | 0200 633-01 2055.000 SY | 37.00000 76035.00| 45.00000 92475.00| 39.00000 80145.00 CONCRETE GUTTER | | | 0205 633-03 123.000 CY | 10.00000 1230.00| 50.00000 6150.00| 25.00000 3075.00 DUMPED ROCK GUTTER | | | 0210 633-04 108.000 SY | 100.00000 10800.00| 125.00000 13500.00| 135.00000 14580.00 SEALED ROCK GUTTER | | | 0211 634-03 35.000 EA | 100.00000 3500.00| 75.00000 2625.00| 92.00000 3220.00 WHEEL STOPS, PRECAST CONCRETE | | | 0215 636-07 6400.000 LF | 1.00000 6400.00| 0.75000 4800.00| 0.50000 3200.00 ERADICATION OF PAVEMENT MARKINGS | | | 0220 636-08 29750.000 LF | 0.20000 5950.00| 0.18000 5355.00| 0.20000 5950.00 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN | | | SOLID LINE | | | 0225 636-09 10700.000 LF | 1.20000 12840.00| 1.02000 10914.00| 1.05000 11235.00 TEMPORARY PAVEMENT MARKINGS-TAPE 4 IN | | | SOLID LINE | | | 0230 636-11 27070.000 UN | 1.20000 32484.00| 1.00000 27070.00| 0.85000 23009.50 TRAFFIC CONTROL DEVICES | | | 0235 636-12 4.000 EA | 350.00000 1400.00| 300.00000 1200.00| 230.00000 920.00 CLEANING OF PROJECT TRAFFIC CONTROL | | | DEVICES | | | 0240 636-13 300.000 EA | 6.00000 1800.00| 5.00000 1500.00| 2.10000 630.00 CLEANING OF INDIVIDUAL TRAFFIC CONTROL | | | DEVICES | | | 0245 636-14 2100.000 HR | 40.00000 84000.00| 35.00000 73500.00| 50.00000 105000.00 FLAGGER | | | 0250 636-17 4000.000 LF | 26.00000 104000.00| 20.00000 80000.00| 14.00000 56000.00 TEMPORARY CONCRETE BARRIERS | | | 0255 636-18 600.000 LF | 12.00000 7200.00| 7.50000 4500.00| 7.50000 4500.00 REMOVING AND RESETTING TEMPORARY | | | CONCRETE BARRIERS | | | 0260 636-25(A) 1200.000 DA | 0.60000 720.00| 0.50000 600.00| 0.40000 480.00 WARNING LIGHTS | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 07/31/00 PAGE : 002 -5 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9907406 COUNTIES : LOGAN LETTING DATE : 07/11/00 10:00 A.M. DISTRICT : 02 SET-ASIDE : ==================================================================================================================================== |(1) 55-0683174 |(2) 61-0874665 |(3) 55-0535003 |HEETER CONSTRUCTION, INC. |ELMO GREER & SONS, LLC |KANAWHA STONE COMPANY, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0265 636-25(B) 4300.000 DA | 1.75000 7525.00| 1.50000 6450.00| 1.40000 6020.00 WARNING LIGHTS | | | 0270 637-01 4695.000 MG | 20.00000 93900.00| 1.00000 4695.00| 23.00000 107985.00 WATER FOR DUST PALLIATIVE | | | 0275 638-02 26.000 EA | 50.00000 1300.00| 43.50000 1131.00| 115.00000 2990.00 RIGHT OF WAY MARKERS | | | 0280 638-03 4.000 EA | 50.00000 200.00| 100.00000 400.00| 200.00000 800.00 SURVEY MARKERS | | | 0285 639-01 LUMP| 215000.00000 215000.00| 225000.00000 225000.00| 200000.00000 200000.00 CONSTRUCTION LAYOUT STAKES | | | 0290 640-01 LUMP| 6000.00000 6000.00| 30000.00000 30000.00| 25000.00000 25000.00 STANDARD FIELD OFFICE AND STORAGE | | | BUILDING | | | 0295 640-03 LUMP| 1000.00000 1000.00| 15000.00000 15000.00| 2500.00000 2500.00 BUILDING EQUIPMENT | | | 0300 642-02 160.000 LF | 25.00000 4000.00| 25.00000 4000.00| 5.00000 800.00 SLOPE DRAINS | | | 0305 642-03-1 36.000 EA | 100.00000 3600.00| 100.00000 3600.00| 125.00000 4500.00 DITCH CHECKS | | | 0310 642-03-3 2732.000 CY | 1.00000 2732.00| 3.00000 8196.00| 5.50000 15026.00 SEDIMENT TRAP | | | 0315 642-03-6 2072.000 CY | 0.01000 20.72| 2.50000 5180.00| 6.00000 12432.00 SEDIMENT REMOVAL | | | 0320 642-03-7 1411.000 CY | 1.00000 1411.00| 5.00000 7055.00| 5.50000 7760.50 SEDIMENT POND | | | 0325 642-04-1 789.000 LB | 0.12000 94.68| 0.10000 78.90| 0.10000 78.90 TEMPORARY SEED | | | 0330 642-04-2 864.000 LB | 0.75000 648.00| 0.65000 561.60| 0.65000 561.60 SEED MIXTURE B | | | 0335 642-04-04 2230.000 LB | 1.80000 4014.00| 1.60000 3568.00| 1.65000 3679.50 SEED MIXTURE L | | | 0340 642-05-1 9.000 TN | 800.00000 7200.00| 650.00000 5850.00| 685.00000 6165.00 STRAW OR HAY MULCH | | | 0345 642-05-2 14.000 TN | 1650.00000 23100.00| 1250.00000 17500.00| 1315.00000 18410.00 WOOD CELLULOSE FIBER MULCH | | | 0350 642-06 9.000 TN | 720.00000 6480.00| 640.00000 5760.00| 675.00000 6075.00 FERTILIZER | | | 0355 642-07 12444.000 SY | 1.05000 13066.20| 0.75000 9333.00| 0.80000 9955.20 FIBER MATTING | | | 0360 642-08 200.000 LF | 20.00000 4000.00| 30.00000 6000.00| 41.00000 8200.00 TEMPORARY PIPE | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 07/31/00 PAGE : 002 -6 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9907406 COUNTIES : LOGAN LETTING DATE : 07/11/00 10:00 A.M. DISTRICT : 02 SET-ASIDE : ==================================================================================================================================== |(1) 55-0683174 |(2) 61-0874665 |(3) 55-0535003 |HEETER CONSTRUCTION, INC. |ELMO GREER & SONS, LLC |KANAWHA STONE COMPANY, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0365 642-09 11200.000 LF | 1.00000 11200.00| 0.75000 8400.00| 0.20000 2240.00 CONTOUR DITCH | | | 0370 642-10 35.000 TN | 22.00000 770.00| 20.00000 700.00| 21.00000 735.00 AGRICULTURAL LIMESTONE | | | 0375 642-11 935.000 EA | 10.00000 9350.00| 6.00000 5610.00| 8.40000 7854.00 HAY OR STRAW BALES | | | 0380 642-12 8400.000 LF | 1.00000 8400.00| 2.50000 21000.00| 3.45000 28980.00 SILT FENCE | | | 0385 652-01 35.000 TN | 22.00000 770.00| 20.00000 700.00| 21.00000 735.00 AGRICULTURAL LIMESTONE | | | 0390 652-02-1 12.000 TN | 550.00000 6600.00| 450.00000 5400.00| 475.00000 5700.00 FERTILIZER, 10-20-10 | | | 0395 652-02-2 4.000 TN | 1350.00000 5400.00| 1200.00000 4800.00| 1260.00000 5040.00 UREA FORMALDEHYDE FERTILIZER | | | 0400 652-03-1 1080.000 LB | 0.25000 270.00| 0.20000 216.00| 0.20000 216.00 SEED MIXTURES B, C-1 OR C-2 | | | 0405 652-03-05 2265.000 LB | 1.25000 2831.25| 1.10000 2491.50| 1.15000 2604.75 SEED MIXTURE L | | | 0410 652-04-1 9.000 TN | 800.00000 7200.00| 700.00000 6300.00| 740.00000 6660.00 STRAW OR HAY MULCH | | | 0415 652-04-2 9.000 TN | 1650.00000 14850.00| 1400.00000 12600.00| 1475.00000 13275.00 WOOD CELLULOSE FIBER MULCH | | | 0420 655-02(B) 3328.000 SY | 6.75000 22464.00| 5.75000 19136.00| 6.00000 19968.00 PERMANENT EROSION MATTING-TYPE B | | | 0421 664-01(IV) 2.000 EA | 7500.00000 15000.00| 6750.00000 13500.00| 7100.00000 14200.00 IMPACT ATTENUATING DEVICE, TYPE IV | | | 0425 664-01(VIII) 1.000 EA | 26000.00000 26000.00| 6250.00000 6250.00| 6600.00000 6600.00 IMPACT ATTENUATOR DEVICE TYPE VIII | | | 0435 401S-1(1)SG AB1 21933.000 TN | 41.50000 910219.50| 47.50000 1041817.50| 50.00000 1096650.00 SUPERPAVE HMA BASE COURSE,ST/GR | | | 0440 401S-1(1)S AB2 20936.000 TN | | | SUPERPAVE HMA BASE COURSE, SLAG | | | 0445 401S-7SG AC1 1085.000 TN | 57.00000 61845.00| 48.00000 52080.00| 50.50000 54792.50 SUPERPAVE HMA SCRATCH COURSE,ST/GR | | | 0450 401S-7S AC2 988.000 TN | | | SUPERPAVE HMA SCRATCH COURSE,SLAG | | | 0455 402S-01(1)SG AD1 2816.000 TN | 60.00000 168960.00| 49.90000 140518.40| 52.50000 147840.00 SUPERPAVE HMA SKID RESISTANT PAVEMENT, | | | ST/GR | | | 0460 402S-01(1)S AD2 2688.000 TN | | | SUPERPAVE HMA SKID RESISTANT PAVEMENT, | | | SLAG | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 07/31/00 PAGE : 002 -7 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9907406 COUNTIES : LOGAN LETTING DATE : 07/11/00 10:00 A.M. DISTRICT : 02 SET-ASIDE : ==================================================================================================================================== |(1) 55-0683174 |(2) 61-0874665 |(3) 55-0535003 |HEETER CONSTRUCTION, INC. |ELMO GREER & SONS, LLC |KANAWHA STONE COMPANY, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0465 604-02(18)A2 AE1 1680.000 LF | 35.00000 58800.00| 24.00000 40320.00| 50.60000 85008.00 FULL BITUMINOUS COATED CORRUGATED STEEL | | | PIPE | | | 0470 604-37(18)III AE2 1680.000 LF | | | REINFORCED CONCRETE PIPE | | | 0475 604-02(24)A2 AF1 591.000 LF | 45.00000 26595.00| 31.00000 18321.00| 52.00000 30732.00 FULL BITUMINOUS COATED CORRUGATED STEEL | | | PIPE | | | 0480 604-37(24)III AF2 591.000 LF | | | REINFORCED CONCRETE PIPE | | | 0485 604-02(30)A2 AG1 816.000 LF | 55.00000 44880.00| 37.00000 30192.00| 60.00000 48960.00 FULL BITUMINOUS COATED CORRUGATED STEEL | | | PIPE | | | 0490 604-37(30)III AG2 816.000 LF | | | REINFORCED CONCRETE PIPE | | | 0495 604-02(36)A2 AH1 82.000 LF | 60.00000 4920.00| 445.00000 36490.00| 68.00000 5576.00 FULL BITUMINOUS COATED CORRUGATED STEEL | | | PIPE | | | 0500 604-37(36)III AH2 82.000 LF | | | REINFORCED CONCRETE PIPE | | | SECTION TOTALS | $ 16,369,416.25| $ 16,445,676.20| $ 17,391,661.45 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0002 COMPUTER SYSTEM | | | 0505 640-04 LUMP| 1000.00000 1000.00| 4500.00000 4500.00| 4000.00000 4000.00 COMPUTER SYSTEM FOR FIELD OFFICE | | | SECTION TOTALS | $ 1,000.00| $ 4,500.00| $ 4,000.00 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0003 SIGNING | | | 0510 657-06(S4X7.7 193.000 LF | 22.50000 4342.50| 29.50000 5693.50| 31.00000 5983.00 A-441SUPPORTS, GALVANIZED | | | 0515 657-06(W6X12) 161.000 LF | 28.00000 4508.00| 34.25000 5514.25| 36.00000 5796.00 A-441SUPPORTS, GALVANIZED | | | 0520 657-06(W 8X18 40.000 LF | 33.00000 1320.00| 37.50000 1500.00| 39.00000 1560.00 A-441SUPPORTS, GALVANIZED | | | 0525 657-08 237.000 LF | 6.00000 1422.00| 6.25000 1481.25| 6.60000 1564.20 (2.00LB) CHANNEL POSTS | | | 0530 657-10 789.000 LF | 8.25000 6509.25| 5.00000 3945.00| 5.30000 4181.70 (3.00LB) CHANNEL POSTS | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 07/31/00 PAGE : 002 -8 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9907406 COUNTIES : LOGAN LETTING DATE : 07/11/00 10:00 A.M. DISTRICT : 02 SET-ASIDE : ==================================================================================================================================== |(1) 55-0683174 |(2) 61-0874665 |(3) 55-0535003 |HEETER CONSTRUCTION, INC. |ELMO GREER & SONS, LLC |KANAWHA STONE COMPANY, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0535 657-17 13.000 CY | 900.00000 11700.00| 603.00000 7839.00| 630.00000 8190.00 CLASS B CONCRETE FOOTING, REINFORCED, | | | ROADSIDE | | | 0540 657-18 48.000 EA | 35.00000 1680.00| 44.00000 2112.00| 46.00000 2208.00 POST REMOVAL | | | 0545 658-01 11.000 CY | 900.00000 9900.00| 996.00000 10956.00| 1050.00000 11550.00 CLASS B CONCRETE FOOTING, REINFORCED, | | | OVERHEAD | | | 0550 658-03 1.000 EA | 45000.00000 45000.00| 39482.00000 39482.00| 41500.00000 41500.00 OVERHEAD SIGN GALVANIZED STEEL | | | 0552 659-01(21)250 LUMP| 9200.00000 9200.00| 10175.00000 10175.00| 10700.00000 10700.00 SIGN LIGHTING TYPE 3 (250W) | | | 0555 661-01(1) 607.000 SF | 27.00000 16389.00| 13.25000 8042.75| 14.00000 8498.00 (0.080),FLAT SHEET SIGNS | | | 0560 661-02 931.000 SF | 31.50000 29326.50| 22.75000 21180.25| 24.00000 22344.00 EXTRUDED PANEL SIGNS | | | 0565 661-04(1) 15.000 EA | 4.50000 67.50| 15.00000 225.00| 21.00000 315.00 DELINEATORS, REFLEX REFLECTOR ,WHITE | | | SINGLE | | | 0570 661-07 2.000 UN | 30.00000 60.00| 15.00000 30.00| 52.60000 105.20 DELINEATORS, AMBER THREE PER UNIT | | | 0575 661-13 19.000 EA | 30.00000 570.00| 25.00000 475.00| 21.00000 399.00 PLASTIC DELINEATOR POSTS | | | SECTION TOTALS | $ 141,994.75| $ 118,651.00| $ 124,894.10 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0004 TRAFFIC SIGNALS | | | 0580 660-01 LUMP| 13000.00000 13000.00| 9810.00000 9810.00| 10300.00000 10300.00 SIGNAL CONTROLLERS | | | 0585 660-02(LPS-C) 6.000 EA | 200.00000 1200.00| 165.00000 990.00| 175.00000 1050.00 TRAFFIC DETECTORS | | | 0590 660-03(V-12) 35.000 EA | 450.00000 15750.00| 375.00000 13125.00| 395.00000 13825.00 SIGNAL SECTIONS | | | 0595 660-04(C1) 3.000 EA | 10200.00000 30600.00| 7815.00000 23445.00| 8230.00000 24690.00 SIGNAL SUPPORTS | | | 0600 660-04(C1L) 1.000 EA | 11000.00000 11000.00| 8700.00000 8700.00| 9160.00000 9160.00 SIGNAL SUPPORTS | | | 0605 660-05(H) 5.000 EA | 900.00000 4500.00| 860.00000 4300.00| 905.00000 4525.00 JUNCTION BOXES, TYPE H | | | 0610 660-07 LUMP| 30000.00000 30000.00| 28430.00000 28430.00| 30000.00000 30000.00 MISCELLANEOUS SIGNAL | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 07/31/00 PAGE : 002 -9 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9907406 COUNTIES : LOGAN LETTING DATE : 07/11/00 10:00 A.M. DISTRICT : 02 SET-ASIDE : ==================================================================================================================================== |(1) 55-0683174 |(2) 61-0874665 |(3) 55-0535003 |HEETER CONSTRUCTION, INC. |ELMO GREER & SONS, LLC |KANAWHA STONE COMPANY, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION TOTALS | $ 106,050.00| $ 88,800.00| $ 93,550.00 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0005 ROADWAY LIGHTING | | | 0620 662-02(1) 1.000 LS | 26500.00000 26500.00| 15500.00000 15500.00| 16000.00000 16000.00 GALVANIZED STEEL CONDUIT | | | 0625 662-06(H18X18 7.000 EA | 1525.00000 10675.00| 1185.00000 8295.00| 1250.00000 8750.00 JUNCTION BOX | | | 0630 662-07(250)W 5.000 EA | 400.00000 2000.00| 395.00000 1975.00| 415.00000 2075.00 LUMINAIRES | | | 0635 662-08(1) 1.000 LS | 6000.00000 6000.00| 10725.00000 10725.00| 11300.00000 11300.00 CABLE | | | 0640 662-10(40-15I 4.000 EA | 4000.00000 16000.00| 2725.00000 10900.00| 2900.00000 11600.00 LIGHTING SUPPORT, TYPE I | | | SECTION TOTALS | $ 61,175.00| $ 47,395.00| $ 49,725.00 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0006 PAVEMENT MARKINGS | | | 0645 663-01-1(II)W 17600.000 LF | 0.25000 4400.00| 0.20000 3520.00| 0.20000 3520.00 EDGE LINE, WHITE | | | 0650 663-01-1(II)Y 10250.000 LF | 0.25000 2562.50| 0.20000 2050.00| 0.22000 2255.00 EDGE LINE, YELLOW | | | 0655 663-02-1(II)W 2470.000 LF | 0.30000 741.00| 0.25000 617.50| 0.22000 543.40 LANE LINE OR CENTERLINE, WHITE | | | 0660 663-03-1(II) 7050.000 LF | 0.25000 1762.50| 0.20000 1410.00| 0.25000 1762.50 BARRIER LINES | | | 0665 663-04(II) 1980.000 LF | 0.50000 990.00| 0.40000 792.00| 0.30000 594.00 TYPE II CHANNELIZING LINES | | | 0670 663-05(V) 285.000 LF | 13.00000 3705.00| 11.00000 3135.00| 11.00000 3135.00 TYPE V, STOP LINES | | | 0675 663-07(V)W 500.000 LF | 6.75000 3375.00| 5.75000 2875.00| 5.30000 2650.00 TYPE V, STRIPES, WHITE | | | 0680 663-07(V)Y 810.000 LF | 7.00000 5670.00| 6.00000 4860.00| 5.30000 4293.00 TYPE V, STRIPES, YELLOW | | | 0685 663-10(V) 22.000 EA | 200.00000 4400.00| 170.00000 3740.00| 170.00000 3740.00 TYPE V, LANE ARROWS | | | 0690 663-11(V) 40.000 EA | 75.00000 3000.00| 85.00000 3400.00| 53.00000 2120.00 TYPE V, LANE LETTERS | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 07/31/00 PAGE : 002 -10 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9907406 COUNTIES : LOGAN LETTING DATE : 07/11/00 10:00 A.M. DISTRICT : 02 SET-ASIDE : ==================================================================================================================================== |(1) 55-0683174 |(2) 61-0874665 |(3) 55-0535003 |HEETER CONSTRUCTION, INC. |ELMO GREER & SONS, LLC |KANAWHA STONE COMPANY, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION TOTALS | $ 30,606.00| $ 26,399.50| $ 24,612.90 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0007 WATERLINE RELOCATION | | | 0694 639-01 LUMP| 15000.00000 15000.00| 2000.00000 2000.00| 700.00000 700.00 CONSTRUCTION LAYOUT STAKES | | | 0695 670-07(2)250 190.000 LF | 12.50000 2375.00| 23.00000 4370.00| 30.50000 5795.00 PLASTIC PIPE, CLASS 250 | | | 0700 670-07(6)200 340.000 LF | 18.50000 6290.00| 42.00000 14280.00| 35.00000 11900.00 PLASTIC PIPE, CLASS 200 | | | 0705 670-07(10)200 575.000 LF | 35.00000 20125.00| 52.00000 29900.00| 46.50000 26737.50 PLASTIC PIPE, CLASS 200 | | | 0710 670-09(6) 2.000 EA | 725.00000 1450.00| 715.00000 1430.00| 1120.00000 2240.00 GATE VALVE AND VALVE BOX | | | 0715 670-13(6) 2.000 EA | 3200.00000 6400.00| 2860.00000 5720.00| 3200.00000 6400.00 FIRE HYDRANT | | | 0720 670-16 8.000 EA | 1350.00000 10800.00| 520.00000 4160.00| 850.00000 6800.00 RELOCATED METERS | | | SECTION TOTALS | $ 62,440.00| $ 61,860.00| $ 60,572.50 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0008 TRAINING | | | 0730 699 2000.000 HR | 0.80000 1600.00| 0.80000 1600.00| 0.80000 1600.00 ON JOB TRAINING | | | SECTION TOTALS | $ 1,600.00| $ 1,600.00| $ 1,600.00 ------------------------------------------+----------------------------+----------------------------+------------------------------- CONTRACT TOTALS | $ 16,774,282.00| $ 16,794,881.70| $ 17,750,615.95 ==================================================================================================================================== 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 07/31/00 PAGE : 002 -11 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9907406 COUNTIES : LOGAN LETTING DATE : 07/11/00 10:00 A.M. DISTRICT : 02 SET-ASIDE : ==================================================================================================================================== |(4) 55-0345840 | | |VECELLIO & GROGAN, INC. | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0001 ROADWAY | | | 0005 201-01 1.000 LS | 851000.00000 851000.00| | CLEARING AND GRUBBING | | | 0010 202-01 LUMP| 1.00000 1.00| | BUILDING DEMOLITION ,202-01(01) | | | 0015 202-01 LUMP| 1.00000 1.00| | BUILDING DEMOLITION ,202-01(04) | | | 0020 202-03 LUMP| 2580.00000 2580.00| | SEPTIC TANK ABANDONMENT ,202-03(01) | | | 0025 204-01 LUMP| 250000.00000 250000.00| | MOBILIZATION | | | 0030 207-01 2324800.000 CY | 7.40000 17203520.00| | UNCLASSIFIED EXCAVATION | | | 0035 207-02 5726.000 CY | 38.00000 217588.00| | SUBGRADE | | | 0040 207-34 41250.000 SY | 1.20000 49500.00| | FABRIC FOR SEPARATION | | | 0042 307-01 1543.000 CY | 48.00000 74064.00| | CLASS 1 AGGREGATE BASE COURSE | | | 0045 311-06 3368.000 CY | 72.00000 242496.00| | OPEN GRADED FREE DRAINING BASE COURSE | | | 0050 409-02 2777.000 GA | 1.05000 2915.85| | BITUMINOUS MATERIAL | | | 0055 601-02 8.000 CY | 1710.00000 13680.00| | CLASS B CONCRETE | | | 0060 604-02(24)A2 157.000 LF | 124.00000 19468.00| | FULL BITUMINOUS COATED CORRUGATED STEEL | | | PIPE | | | 0065 604-02(36)A2 311.000 LF | 100.00000 31100.00| | FULL BITUMINOUS COATED CORRUGATED STEEL | | | PIPE | | | 0070 604-37(18)III 467.000 LF | 44.00000 20548.00| | REINFORCED CONCRETE PIPE | | | 0075 604-37(24)III 926.000 LF | 40.00000 37040.00| | REINFORCED CONCRETE PIPE | | | 0080 604-37(30)III 520.000 LF | 58.00000 30160.00| | REINFORCED CONCRETE PIPE | | | 0085 604-37(36)III 886.000 LF | 76.00000 67336.00| | REINFORCED CONCRETE PIPE | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 07/31/00 PAGE : 002 -12 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9907406 COUNTIES : LOGAN LETTING DATE : 07/11/00 10:00 A.M. DISTRICT : 02 SET-ASIDE : ==================================================================================================================================== |(4) 55-0345840 | | |VECELLIO & GROGAN, INC. | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0090 604-54(24)V 74.000 LF | 1300.00000 96200.00| | JACKED CONDUIT, REINFORCED CONCRETE | | | PIPE CLASS V | | | 0095 604-54(36)V 150.000 LF | 1400.00000 210000.00| | JACKED CONDUIT, REINFORCED CONCRETE | | | PIPE CLASS V | | | 0100 605-01 3.000 EA | 4900.00000 14700.00| | TYPE A MANHOLE | | | 0105 605-01-1 4.000 EA | 6000.00000 24000.00| | TYPE A MANHOLE, MODIFIED | | | 0110 605-04 18.000 EA | 1700.00000 30600.00| | TYPE B INLET | | | 0115 605-09 32.000 EA | 2500.00000 80000.00| | TYPE G INLET | | | 0120 606-22 173.000 CY | 50.00000 8650.00| | CRUSHED STONE, GRAVEL,OR SILICA SAND | | | FOR UNDERDRAINS | | | 0125 606-25(6) 1992.000 LF | 10.50000 20916.00| | UNDERDRAIN PIPE | | | 0130 606-29 7964.000 LF | 13.00000 103532.00| | FREE DRAINING BASE (FDB) TRENCH | | | 0135 606-30 605.000 LF | 10.50000 6352.50| | OUTLET PIPE | | | 0140 607-01(I) 3283.000 LF | 11.00000 36113.00| | TYPE 1 GUARDRAIL | | | 0145 607-06 2.000 EA | 2000.00000 4000.00| | THRIE BEAM GUARDRAIL BRIDGE TRANSITION | | | 0150 607-09-1 104.000 LF | 10.00000 1040.00| | TYPE 1 GUARDRAIL REMOVED AND RESET | | | 0155 607-25(B) 2.000 EA | 860.00000 1720.00| | CUT SLOPE TERMINAL, TYPE B | | | 0160 607-30 2.000 EA | 460.00000 920.00| | SPECIAL TRAILING END TERMINAL | | | 0165 607-65 4.000 EA | 1400.00000 5600.00| | FLARED END TERMINAL | | | 0170 608-02(3F11I) 7796.000 LF | 17.00000 132532.00| | RIGHT-OF-WAY FENCE, FARM FIELD TYPE | | | 0175 609-01 45.000 SY | 36.00000 1620.00| | CONCRETE SIDEWALK | | | 0180 610-01(IV) 90.000 LF | 21.00000 1890.00| | PLAIN CONCRETE CURBING | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 07/31/00 PAGE : 002 -13 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9907406 COUNTIES : LOGAN LETTING DATE : 07/11/00 10:00 A.M. DISTRICT : 02 SET-ASIDE : ==================================================================================================================================== |(4) 55-0345840 | | |VECELLIO & GROGAN, INC. | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0185 610-03(I)MOD 866.000 LF | 32.00000 27712.00| | COMBINATION CONCRETE CURB AND GUTTER | | | (MODIFIED) | | | 0190 610-03(IV)MOD 262.000 LF | 32.00000 8384.00| | COMBINATION CONCRETE CURB AND GUTTER, | | | MODIFIED | | | 0195 610-06(V) 3459.000 LF | 90.00000 311310.00| | MEDIAN, TYPE V | | | 0200 633-01 2055.000 SY | 70.00000 143850.00| | CONCRETE GUTTER | | | 0205 633-03 123.000 CY | 25.00000 3075.00| | DUMPED ROCK GUTTER | | | 0210 633-04 108.000 SY | 150.00000 16200.00| | SEALED ROCK GUTTER | | | 0211 634-03 35.000 EA | 130.00000 4550.00| | WHEEL STOPS, PRECAST CONCRETE | | | 0215 636-07 6400.000 LF | 0.60000 3840.00| | ERADICATION OF PAVEMENT MARKINGS | | | 0220 636-08 29750.000 LF | 0.20000 5950.00| | TEMPORARY PAVEMENT MARKINGS-PAINT 4IN | | | SOLID LINE | | | 0225 636-09 10700.000 LF | 1.00000 10700.00| | TEMPORARY PAVEMENT MARKINGS-TAPE 4 IN | | | SOLID LINE | | | 0230 636-11 27070.000 UN | 0.85000 23009.50| | TRAFFIC CONTROL DEVICES | | | 0235 636-12 4.000 EA | 230.00000 920.00| | CLEANING OF PROJECT TRAFFIC CONTROL | | | DEVICES | | | 0240 636-13 300.000 EA | 2.00000 600.00| | CLEANING OF INDIVIDUAL TRAFFIC CONTROL | | | DEVICES | | | 0245 636-14 2100.000 HR | 51.00000 107100.00| | FLAGGER | | | 0250 636-17 4000.000 LF | 16.70000 66800.00| | TEMPORARY CONCRETE BARRIERS | | | 0255 636-18 600.000 LF | 8.00000 4800.00| | REMOVING AND RESETTING TEMPORARY | | | CONCRETE BARRIERS | | | 0260 636-25(A) 1200.000 DA | 0.50000 600.00| | WARNING LIGHTS | | | 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 07/31/00 PAGE : 002 -14 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 9907406 COUNTIES : LOGAN LETTING DATE : 07/11/00 10:00 A.M. DISTRICT : 02 SET-ASIDE : ==================================================================================================================================== |(4) 55-0345840 | | |VECELLIO & GROGAN, INC. | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0265 636-25(B) 4300.000 DA | 1.40000 6020.00| | WARNING LIGHTS | | | 0270 637-01 4695.000 MG | 26.00000 122070.00| | WATER FOR DUST PALLIATIVE | | | 0275 638-02 26.000 EA | 100.00000 2600.00| | RIGHT OF WAY MARKERS | | | 0280 638-03 4.000 EA | 215.00000 860.00| | SURVEY MARKERS | | | 0285 639-01 LUMP| 300000.00000 300000.00| | CONSTRUCTION LAYOUT STAKES | | | 0290 640-01 LUMP| 60000.00000 60000.00| | STANDARD FIELD OFFICE AND STORAGE | | | BUILDING | | | 0295 640-03 LUMP| 25000.00000 25000.00| | BUILDING EQUIPMENT | | | 0300 642-02 160.000 LF | 20.00000 3200.00| | SLOPE DRAINS | | | 0305 642-03-1 36.000 EA | 140.00000 5040.00| | DITCH CHECKS | | | 0310 642-03-3 2732.000 CY | 7.00000 19124.00| | SEDIMENT TRAP | | | 0315 642-03-6 2072.000 CY | 7.00000 14504.00| | SEDIMENT REMOVAL | | | 0320 642-03-7 1411.000 CY | 8.00000 11288.00| | SEDIMENT POND | | | 0325 642-04-1 789.000 LB | 0.10000 78.90| | TEMPORARY SEED | | | 0330 642-04-2 864.000 LB | 0.65000 561.60| | SEED MIXTURE B | | | 0335 642-04-04 2230.000 LB | 1.70000 3791.00| | SEED MIXTURE L | | |